Unnatti Methodology and quality procedure.pdf

8 misc 27 nos t0tal 300 nos iv deployment of plant

Info icon This preview shows pages 7–11. Sign up to view the full content.

View Full Document Right Arrow Icon
8. Misc : 27 Nos T0TAL : 300 NOS IV) DEPLOYMENT OF PLANT AND MACHINERY DURING PEAK PERIOD: 1. Poclain : 1 Nos. 2. Dumpers : As Reqd. 3. Concrete Mixer : 4 Nos. 4. Concrete Pump : As Reqd. 5. Steel Cutting Machine : 1 Nos. 6. Builder's Hoist : 2 Nos. 7. Welding Machine : As Reqd. 8. Gas Cutting Set : As Reqd. 9. Shuttering form work : As Reqd. 10. Dewatering Pump : 4 Nos. 11. Polishing - machine for Floor : 4 Nos. 12. Vibrator (Diesel) : 4 Nos. 13. Vibrator (Elec.) : 8 Nos. 14. Earth Rammer : 2 Nos. 15. Wheel barrows : 18 Nos. 16. Tractor : 1 Nos. 17. JCB : As Reqd. 18. Roller : 2 Nos.
Image of page 7

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
UNNATTI CONSTRUCTIONS PVT. LTD . (ISO 9001:2000) 8 V) OUR SITE OFFICE SHALL CONSIST OF FOLLOWING Computer : 01 No Phone : 01 No Fax : 01 No Furniture etc. : 1 Lot VI) OUR SITE LABORATORY SHALL CONSIST OF FOLLOWING: 1. Test Sieve : 2 Lot 2. Slump Cones : 2 Nos 3. Weight Balance : 1 Nos 4. Cubes, Glass Jar etc. : 2 Set 5. Cube testing machine : 1 No 6. Cube Mould : 18 No VII) CEMENT GODOWN : Consider 10 days stock will be 3000 Bags Size 8 X 10 Meters. VIII) LABOUR CAMP : Consider 150 Person during Peak time, the area required for labor Camp 30,000 Sqft. IX) SITE STORE : 700 Sqft. General Civil Items Survey Instruments : Lot. (Theodolite, Dumpy Levels, Level Staff etc.) Safety Items : Lot. (Helmet, Safety Belts, First Aid Box, Safety Net etc.) X) REINFORCEMENT STEEL - YARD 10,000 Sqft . XI) STRUCTRAL STEEL – YARD 10,000 Sqft.
Image of page 8
UNNATTI CONSTRUCTIONS PVT. LTD . (ISO 9001:2000) 9 E. COMPUTER & COMMUNICATION FACILITY : As a standard practice prevalent in our organization, monitoring and control of all projects executed by us has been computerized. In all our sites we installed Computer, necessary telephone and fax facilities to facilitate smooth communication. We hope to provide the same at this site too. F. CO-ORDINATION PROCEDURE 1. Project Coordination : a) Daily Site Review Meeting b) Weekly Site Coordination Meetings c) Fortnightly Project Coordination Meetings d) Monthly Site coordination Meetings f) Detailed Monthly Progress & Status Reports highlighting the progress of all the activities, right from concept to commissioning, Drawing & material Procurement Reports and brief minutes of meetings and action points will be prepared and circulated to Clients by UNNATTI.
Image of page 9

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
UNNATTI CONSTRUCTIONS PVT. LTD . (ISO 9001:2000) 10 MONTHLY REPORT SHOWING UPDATE PROGRAMME, COSTS & FORCASTS, VARIATION, SAFETY, ETC. UNNATTI will prepare Status Report on Monthly basis with following Annexure: A. Annexure -I Review of Pending Points on various meetings held with clients which are minted. B. Annexure-II, Procurement Schedules, Drawings Schedules and Erection, Commissioning Schedule. C. Annexure-III. Work Progress during and at the end of the month. D. Annexure-V. Updated construction schedule indicating upto date achievement/slippage vis-à-vis planned for civil works. E. Annexure-VIII. Photographs on progress at every month end. G. PROCUREMENT PROCEDURE: UNNATTI will work out the requirement of Brought out item required for the Project. With excellent contacts UNNATTI has with the various suppliers, UNNATTI would be in a position to get more attractive prices for these items.
Image of page 10
Image of page 11
This is the end of the preview. Sign up to access the rest of the document.

{[ snackBarMessage ]}

What students are saying

  • Left Quote Icon

    As a current student on this bumpy collegiate pathway, I stumbled upon Course Hero, where I can find study resources for nearly all my courses, get online help from tutors 24/7, and even share my old projects, papers, and lecture notes with other students.

    Student Picture

    Kiran Temple University Fox School of Business ‘17, Course Hero Intern

  • Left Quote Icon

    I cannot even describe how much Course Hero helped me this summer. It’s truly become something I can always rely on and help me. In the end, I was not only able to survive summer classes, but I was able to thrive thanks to Course Hero.

    Student Picture

    Dana University of Pennsylvania ‘17, Course Hero Intern

  • Left Quote Icon

    The ability to access any university’s resources through Course Hero proved invaluable in my case. I was behind on Tulane coursework and actually used UCLA’s materials to help me move forward and get everything together on time.

    Student Picture

    Jill Tulane University ‘16, Course Hero Intern