A customer is planning a multi threaded hpc solution

  • No School
  • AA 1
  • ConstableEchidna4463
  • 11
  • 100% (1) 1 out of 1 people found this document helpful

This preview shows page 2 - 5 out of 11 pages.

QUESTION 3A customer is planning a multi-threaded HPC solution that would benefit from threads running in parallel. - Download A+ VCE (latest) free Open VCE Exams - VCE to PDF Converter - VCE Exam Simulator - VCE Online
Image of page 2
The architect selects the HPE Apollo 6000 and needs to choose between the HPE XL230a and the XL250a compute trayWhat is one reason for choosing the XL250a tray? A. The HPE XL250a server supports DDR4 HPE Smart Memory.B. The HPE XL250a server supports dual accelerators.C. The HPE XL250a server provides full length PCIe expansion slots.D. The HPE XL250a server delivers dual processor performance.Correct Answer: Section: (none)ExplanationExplanation/Reference:Explanation:The HPE ProLiant XL250a Gen9 Server delivers 2P performance for your budget with dual accelerator support, while leveraging the HPE Apollo 6000 System andits modular flexibility and rack-scale efficiency. This server features the Intel® Xeon® E5-2600 v3/v4 series processors and 16 DIMM slots are ready with DDR42133 (1024 GB maximum)/2400 (2048 GB maximum) MHz memory and HPE SmartMemory.Reference - server.7307070.html B QUESTION 4An architect takes the following notes during a meeting with a customer:•plans to introduce an entirely new service offering to customers•servers will be virtualized and will consume large amounts of storage space•project is to operate in an isolated section of the data center with limited access to the corporate network•need flexibility to grow quickly as required by the new service demands on the infrastructure•has no repeatable process for firmware management•concerned about how long it will take for the project team to become productive on the new infrastructureWhich solution should the architect propose to help the customer overcome all of its project challenges? B Explanation Explanation/Reference: - Download A+ VCE (latest) free Open VCE Exams - VCE to PDF Converter - VCE Exam Simulator - VCE Online
Image of page 3
QUESTION 5View the ExhibitRefer to the exhibit. A customer has an HPE c7000 enclosure managed by HPE OneView with HP BL460c Gen9 servers in a vSphere cluster. The customer hasmultiple vLANs trunked from the top of rack (TOR) switches to the Virtual Connect modules in the enclosure. Due to network Access Control List (ACL)requirement and guidelines from the networking department, all network traffic should be forced to an upstream switch using the Virtual Connect "Private Network"feature.The customer reports slow network response.Which modification can the architect recommend to improve network performance?
Image of page 4
Image of page 5

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture