Bobolosan 138 kV Transmission Line Project This project aims to extend the 69 kV line from Bobolosan to Taft. A 138 kV (69 kV energized) transmission line is proposed to form a 69 kV loop between Northern and Eastern Samar. This allows for the operational flexibility and reliability for NORSAMELCO and ESAMELCO. 9.2 Proposed Transmission Outlook for 2030 With the implementation of projects that will strengthen the Visayas Backbone, future developments in terms of commercial and industrial sector in Visayas that would increase the power supply requirements are being expected. To anticipate these developments, the main backbone will be extended towards Western Panay and Northern Samar. The interconnection of the 230 kV Backbone from Panay to Leyte will be unified by linking the CNP 230 kV Backbone to the Cebu Ormoc 230 kV Line. This will be realized upon completion of the Umapad Compostela 230 kV Transmission Line Project. More generations are expected to come in Panay that will need major reinforcements of the 230 kV lines. While Northern Samar has no proposed generation addition yet, the need to extend the 138 kV line from Calbayog to Catarman will provide reliability as the demand in the island increases. CALBAYOG S/S BOBOLOSAN SWS PALANAS CARA CAPOOCAN BOBON ALLEN PARANAS CATBALOGAN SAN AGUSTIN TAFT SWS BORONGAN QUINAPONDAN 50 MVA 30 MVA 50 MVA PARANAS S/S 123 km 138 kV designed OHTL (69 kV energized)
Image of page 174
163 Figure 9.2: Proposed Visayas Transmission Outlook for 2030 Shown in Table 9.2 is the list of proposed transmission projects for Visayas by 2030. Table 9.2: Proposed Transmission Outlook for 2030 Project Name/Driver(s) Province(s) and Components ETC Load Growth Sipalay 138 kV Substation Project Negros Dec 2029 Substation Components: Sipalay S/S, 2x100 MVA 138/69 kV Power Transformer and accessories, 1-138 kV PCB, 1-69 kV PCB and associated equipment. Calbayog Allen Catarman 138 kV Transmission Line Project Samar Dec 2030 Transmission Components: Calbayog Allen Catarman T/L Extension, ST/DC, 1-795 MCM ACSR, 40 km. Substation Components: Catarman S/S, 2x100 MVA 138/69 kV Power Transformer and accessories, 10-138 kV PCBs, 6-69 kV PCBs and associated equipment. Kananga-Babatngon 230 kV Transmission Line Project Leyte Jul 2030 Transmission Components: Kananga Babatngon T/L, ST-DC, 4-795 MCM ACSR, 65 km. Substation Components: Babatngon: 2x300 MVA 230/138 kV Power Transformer and accessories, 10- 230 kV PCBs, 3-138 kV PCBs and associated equipment; Kananga SWS: 10-230 kV PCBs and associated equipment.
Image of page 175
164 Project Name/Driver(s) Province(s) and Components ETC Power Quality Visayas Voltage Improvement Project 2 Negros, Leyte, Panay Dec 2030 Substation Components: Bacolod 138 kV S/S, 4x50 MVAR Capacitor Bank, 4-138 kV PCBs and associated equipment; Maasin 138 kV S/S, 4x20 MVAR Capacitor Bank, 4-138 kV PCBs and associated equipment; Panit-an 138 kV S/S, 2x20 MVAR Capacitor Bank, 2-138 kV PCBs and associated equipment.
Image of page 176
Image of page 177

You've reached the end of your free preview.

Want to read all 268 pages?

  • Winter '15
  • Electricity generation, Electric power transmission, Electricity distribution, NGCP

What students are saying

  • Left Quote Icon

    As a current student on this bumpy collegiate pathway, I stumbled upon Course Hero, where I can find study resources for nearly all my courses, get online help from tutors 24/7, and even share my old projects, papers, and lecture notes with other students.

    Student Picture

    Kiran Temple University Fox School of Business ‘17, Course Hero Intern

  • Left Quote Icon

    I cannot even describe how much Course Hero helped me this summer. It’s truly become something I can always rely on and help me. In the end, I was not only able to survive summer classes, but I was able to thrive thanks to Course Hero.

    Student Picture

    Dana University of Pennsylvania ‘17, Course Hero Intern

  • Left Quote Icon

    The ability to access any university’s resources through Course Hero proved invaluable in my case. I was behind on Tulane coursework and actually used UCLA’s materials to help me move forward and get everything together on time.

    Student Picture

    Jill Tulane University ‘16, Course Hero Intern

Stuck? We have tutors online 24/7 who can help you get unstuck.
A+ icon
Ask Expert Tutors You can ask You can ask You can ask (will expire )
Answers in as fast as 15 minutes