LOT SIZE: MIN 100 LT: 1 1 2 3 4 5 Gross Requirements Scheduled Receipts Projected on Hand 150 Net Requirements Planned Order Receipts Planned Order Releases PERIOD PLANNED ORDER RELEASES 1 2 3 4 5 Clipboard 100 100 100 Lapdesk 50 50
Background image of page 24

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
PERIOD ITEM 1 2 3 4 5 Clipboard Lapdesk Pressboard Planned Order Report
Background image of page 25
Planned Order Report Item #2740 Date 9 - 25 - 15 On hand 100 Lead time 2 weeks On order 200 Lot size 200 Allocated 50 Safety stock 50 SCHEDULED PROJECTED DATE ORDER NO. GROSS REQS. RECEIPTS ON HAND ACTION 50 9-26 AL 4416 25 25 9-30 AL 4147 25 0 10-01 GR 6470 50 - 50 10-08 SR 7542 200 150 Expedite SR 10-01 10-10 CO 4471 75 75 10-15 GR 6471 50 25 10-23 GR 6471 25 0 10-27 GR 6473 50 - 50 Release PO 10-13 Key: AL = allocated WO = work order CO = customer order SR = scheduled receipt PO = purchase order GR = gross requirement
Background image of page 26

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
MRP Action Report Current date 9-25-15 ITEM DATE ORDER NO. QTY. ACTION #2740 10-08 7542 200 Expedite SR 10-01 #3616 10-09 Move forward PO 10-07 #2412 10-10 Move forward PO 10-05 #3427 10-15 Move backward PO 10-25 #2516 10-20 7648 100 De-expedite SR 10-30 #2740 10-27 200 Release PO 10-13 #3666 10-31 50 Release WO 10-24
Background image of page 27
Capacity Requirements Planning (CRP) Creates a load profile Identifies under-loads and over-loads Determines whether MRP plan is doable
Background image of page 28

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
MRP planned order releases Routing file Capacity requirements planning Open orders file Load profile for each machine center
Background image of page 29
Remedies for Underloaded Conditions 1. Acquire more work 2. Pull work ahead that is scheduled for later time periods 3. Reduce normal capacity
Background image of page 30

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
Remedies for Overloaded Conditions 1. Eliminating unnecessary requirements 2. Rerouting jobs to alternative machines, workers, or work centers 3. Splitting lots between two or more machines 4. Increasing normal capacity 5. Subcontracting 6. Increasing efficiency of the operation 7. Pushing work back to later time periods
Background image of page 31
Initial Load Profile Hours of capacity 1 2 3 4 5 6 Time (weeks) Normal capacity 120 – 110 – 100 – 90 – 80 – 70 – 60 – 50 – 40 – 30 – 20 – 10 – 0 –
Background image of page 32

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
Adjusted Load Profile Hours of capacity 1 2 3 4 5 6 Time (weeks) Normal capacity 120 – 110 – 100 – 90 – 80 – 70 – 60 – 50 – 40 – 30 – 20 – 10 – 0 – Pull ahead Push back Push back Overtime Work an extra shift
Background image of page 33
Image of page 34
This is the end of the preview. Sign up to access the rest of the document.

{[ snackBarMessage ]}

Page24 / 44

LOT SIZE MIN 100 LT 1 1 2 3 4 5 Gross Requirements...