Correct 100 points out of 100 Dirk the project manager is leading the team

Correct 100 points out of 100 dirk the project

This preview shows page 3 - 5 out of 19 pages.

Question CorrectDirk, the project manager, is leading the team during the execution of the projectmanagement plan. His testing manager, Sarah, has just completed deliverable testing,which resulted in deliverables that met all requirements. What have Dirk and Sarahcreated and what is the next process the deliverables will undergo? 4 1.00 points out of 1.00 Select one:a. Quality Audits and Control Qualityb. Control Quality and Change Requestsc. Validate Scope and Close Project or Phased. Verified Deliverables and Validate Scope The question references both the Control Quality process, which creates verified deliverables, and the Validate Scope process, which occurs later and results in customer acceptance of those deliverables. Quality audits occur during the Manage Quality process. The Close Project or Phase results in the transition of the project outcome. Verified Deliverables is not a project management process. [Crosswind 5.5 and 8.10; PMBOK® Guide 5.5 and 8.3] The correct answer is: Verified Deliverables and Validate Scope
Image of page 3
/ Question Correct 5 1.00 points out of 1.00 Question Correct 6 1.00 points out of 1.00 Due to the complexity of the project to design touchscreen displays for use on mobileworkstation tablets, a number of breakdown structures will be used. Of the followingbreakdown structures and descriptions, which is correct?
Image of page 4
Image of page 5

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture