Professor savic ivana savic 2212016 collection

  • Bellevue University
  • MBA 675
  • Homework Help
  • BellevueRebel
  • 28
  • 91% (22) 20 out of 22 people found this document helpful

This preview shows page 3 - 6 out of 28 pages.

Professor SavicIvana Savic
2/21/2016Collection – MBA675­T303 Operations & Logistics in the (...4/28Thread:Neubauer ­ Q5Post:Neubauer ­ Q5Author:Posted Date:January 5, 2016 11:23 AMStatus:Published(Post is Read)5. What is statistical process control?Provide an example. From theInternet, find an example of statistical process control.Provide theweb site address.
ReferencesBenneyan, J.; Lloyd, R.; Plsek, P. (2003).Statistical process control as a tool forresearch and healthcare improvement. Retrieved January 4, 2016 fromBusiness Dictionary.com. (2015).statistical process control. Retrieved January4, 2016 from ­process­control­SPC.htmlAttachment:Statistical process control as a tool for research.pdf(219.748 KB)Shane NeubauerThread:Neubauer ­ Q5Post:RE: Neubauer ­ Q5Author:Posted Date:January 5, 2016 11:39 AMStatus:PublishedShane,How would you define SPC in your own words? Also, please summarize thearticle's main points, procedure and/or findings in order to receive full points.Thank you,Ivana Savic
2/21/2016Collection – MBA675­T303 Operations & Logistics in the (...5/28(Post is Read)Professor SavicThread:Neubauer ­ Q5Post:RE: Neubauer ­ Q5Author:Posted Date:January 6, 2016 8:35 PMStatus:PublishedSPC uses statistics to find trends within a process in order to identify areas that might needimprovement. A part of the SPC process involves the use of control charts. Control charts areused to identify how a process changes over a period of time, and also illustrates if the processisinorout of control. A control chart consists of upper and lower control limits (UCL and LCL)and a center line which are used to understand if the data points are staying within the identifiedparameters of the process. If the data is consistently inside the UCL and LCL, then theprocess is said to bein control. If data points stray outside the UCL and LCL, the process issaid to beout of control.

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture