21 C6: manufacturing lead time = 2weeks M6: ordering lead time = 2 weeks And inventory on hand is 50 How MRP works? (20 marks) Solution Period 1 2 3 4 5 6 7 8 9 10 Item: Product P 1 Gross Requirements 50 100 Schedule Receipts On Hand 0 Net Requirements 50 100 Planned Order Release 50 50 Item: Product P 2 Gross Requirements 50 100 Schedule Receipts On Hand 0 Net Requirements Planned Order Release 50 100 Item: Subassembly S 3 Gross Requirements 50 100 Schedule Receipts On Hand Net Requirements Planned Order Release 50 100 50 100 Item: Subassby S 2 Gross Requirements 100 200 Schedule Receipts On Hand Net Requirements 100 200 Planned Order Release 100 200 Item: Component C 4 Gross Requirements 50 200 100 400 Schedule Receipts On Hand Net Requirements 50 200 100 400 Planned Order Release 50 200 100 400 Item: Component C6 Gross Requirements 100 100 200 200 Schedule Receipts On Hand Net Requirements 100 100 200 200 Planned Order Release 100 100 200 200
Image of page 155

Info icon This preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
22 Item: Material M4 100 400 200 300 Gross Requirements Schedule Receipts On Hand 100 Net Requirements 0 400 200 300 Planned Order Release 400 200 300 Item: Material M6 200 200 400 400 Gross Requirements Schedule Receipts On Hand 50 Net Requirements 150 200 400 400 Planned Order Release 150 200 400 400 12. Discuss briefly the shop floor control in production management with the help of the diagram. (25 marks) Shop floor control is concerned with the release of the production orders to the factory controlling the progress of the order through the various work centers, and acquiring current information on the status of the order. The simplest possible terms, shop floor control deals with managing the work in process. A typical shop floor control system consists of three phases. 1. Order release 2. Order scheduling 3. Order progress Other release The order release phase of the shop floor control provides the documentation needed to process a production order through the factory. The collection of documents is called the shop packet. It consists of Route sheet Material questions to draw the necessary materials from inventory. Job cards or other means to report direct labor time devoted to the order; also used to indicate progress of the order through the factory. Move tickets to authorize the material handling personnel to transport parts between works centers in the factory if this type of authorization is required. Past list, if required for assembly jobs The order release is driven by two inputs. The first is the authorization to produce that drives from the master schedule. This authorization proceeds through the various planning functions that provide timing and scheduling information. The second input to the order release module is the engineering and manufacturing databases, which provide the product structure and process planning information needed to prepare the various documents that accompany the order through the shop.
Image of page 156
Image of page 157
This is the end of the preview. Sign up to access the rest of the document.

{[ snackBarMessage ]}

What students are saying

  • Left Quote Icon

    As a current student on this bumpy collegiate pathway, I stumbled upon Course Hero, where I can find study resources for nearly all my courses, get online help from tutors 24/7, and even share my old projects, papers, and lecture notes with other students.

    Student Picture

    Kiran Temple University Fox School of Business ‘17, Course Hero Intern

  • Left Quote Icon

    I cannot even describe how much Course Hero helped me this summer. It’s truly become something I can always rely on and help me. In the end, I was not only able to survive summer classes, but I was able to thrive thanks to Course Hero.

    Student Picture

    Dana University of Pennsylvania ‘17, Course Hero Intern

  • Left Quote Icon

    The ability to access any university’s resources through Course Hero proved invaluable in my case. I was behind on Tulane coursework and actually used UCLA’s materials to help me move forward and get everything together on time.

    Student Picture

    Jill Tulane University ‘16, Course Hero Intern