Lane are likely to be completed soon iv augmentation

Info icon This preview shows pages 31–34. Sign up to view the full content.

View Full Document Right Arrow Icon
Lane are likely to be completed soon; (iv) Augmentation of LT distribution system at Netaji Nagar, Laxmi Bai Nagar, Kidwai Nagar (E) and Moti Bagh have been completed during 2002-03; (v) High mast lights were installed at 14 places and 17 more are likely to be installed soon; (vi) A temporary sub-station of 20MVA capacity has been established at B.D. Marg for which double circuit feeder of 66KV was laid by the Delhi Power Supply Company. This will facilitate in releasing connection to important buildings such as Parliament library, R.M.L. Hospital and M.P.’s hostel at Baba Kharag Singh Marg; (vii) During 2002-03 the Delhi Power Supply Company started laying 66 KV feeder from their Ridge Valley substation to NDMC’s proposed 66 KV substation at State Guesthouse. Additional capacity of 20 MVA will be available at State Guest House substation for releasing load to various embassies in Chanakya Puri. Roads Resurfacing During the current year important roads like Shershah Road, Shahjahan Road and Shrimant Madhav Rao Scindia Marg were resurfaced. Work has been awarded for resurfacing of Moti Lal Nehru Marg, Man Singh Road, Dr. Rajendra Prasad Marg, Kautilya Marg, Dr. Bishamber Dass Marg, Jaswant Singh Road, Jai Singh Road, C.P. Radials and Middle Circle. - 31 -
Image of page 31

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
Construction of Pedestrians Sub-Ways An underground subway at Bhagwan Dass Road near Supreme Court was constructed. School Lane Flyover The School Lane flyover, constructed in 1982, had become unsafe due to development of cracks in vital areas of the structure. The rehabilitation work was completed and the flyover was opened to traffic this year. Beautification of Malcha Marg A project for environmental improvement, organized parking and beautification of Malcha Marg market has been envisaged in Diplomatic Enclave. Work is likely to be completed later this year. Housing (i) Four Type-V flats at South End Lane were constructed during 2002-03 and allotted to NDMC officers. In addition, eighteen type IV quarters are under construction at the same place. (ii) 128 flats at Rohini were completed and allotted to NDMC’s Employees in the last financial year. 128 flats have also now been completed and shall be ready for allotment in the near future. Projects Commercial Projects (i) The structural work for NDCC Phase II is nearing completion. The balance finishing works are being tendered for and are expected to take another 2 years to be completed. This building is now expected to be completed sometime in early 2005. Revised estimate of the project is Rs 82 crore. (ii) Guniting work in Chanderlok Building, water proofing treatment at the terrace of 9 th and 11 th storey of Lok Nayak Bhavan and strengthening of structure - 32 -
Image of page 32
damaged during the earthquake and water proofing treatment at the terrace of Palika Bazar (Phase I & II) were carried out during 2002-03.
Image of page 33

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
Image of page 34
This is the end of the preview. Sign up to access the rest of the document.

{[ snackBarMessage ]}

What students are saying

  • Left Quote Icon

    As a current student on this bumpy collegiate pathway, I stumbled upon Course Hero, where I can find study resources for nearly all my courses, get online help from tutors 24/7, and even share my old projects, papers, and lecture notes with other students.

    Student Picture

    Kiran Temple University Fox School of Business ‘17, Course Hero Intern

  • Left Quote Icon

    I cannot even describe how much Course Hero helped me this summer. It’s truly become something I can always rely on and help me. In the end, I was not only able to survive summer classes, but I was able to thrive thanks to Course Hero.

    Student Picture

    Dana University of Pennsylvania ‘17, Course Hero Intern

  • Left Quote Icon

    The ability to access any university’s resources through Course Hero proved invaluable in my case. I was behind on Tulane coursework and actually used UCLA’s materials to help me move forward and get everything together on time.

    Student Picture

    Jill Tulane University ‘16, Course Hero Intern