Course Hero Logo

2 preliminary cx schedule submit final cx schedule to

Course Hero uses AI to attempt to automatically extract content from documents to surface to you and others so you can study better, e.g., in search results, to enrich docs, and more. This preview shows page 10 - 12 out of 19 pages.

.2Preliminary Cx schedule. Submit final Cx schedule to CxA forreview prior to performance verification..3Submit the names of all personnel for approval by the CxA.Designate who has managerial responsibilities for coordination ofinstallation verification and performance verification..4Submit documentation to confirm personnel compliance with qualityassurance provisions..3Any changes to the information submitted must be re-submitted Ensurecertified trades persons, certified testing agencies and/or factoryauthorized personnel participate in commissioning tasks..4Prior to start of Performance Verification:.1Submit TAB report to CxA for review..2Submit start-up documentation to CxA for review..3Submit completed Installation Verification checklists..5Fifteen (15) days prior to application for Substantial Completion:.1Submit three (3) copies of final commissioning manual andapplicable forms to the CM for review.Ver. 10/22
NL Master Specification Guidefor Public Funded BuildingsSection 01 91 13.13 – Commissioning (Cx)Re-Issued 2022/10/11RequirementsPage 11 of 19.2Submit reports of performance verifications postponed due toseasonal, climatic, occupancy, or other reasons beyond theContractor’s control, promptly after execution of those services..6Ensure each form bears the required signatures as indicated on the form..7Submit as-built drawings, schematics, O&M manuals, maintenancematerials and warranties to CM for review..8Where structurally attached equipment is included in the scope of work,engage a third party Professional Structural Engineer, licensed to practicein the Province of Newfoundland and Labrador, for submission of stampedand signed shop drawings indicating acceptable mounting procedures forall equipment which is suspended, mounted or otherwise attached, as perSection 01 33 00 – Submittal Procedures. The Structural Engineer to alsoverify correct installation of the equipment.1.9COMMISSIONING DOCUMENTATION.1Refer to Section 01 91 13.16 - Commissioning (Cx) Forms forrequirements and instructions for use as well as the Cx Manual.2Checklists will be provided to the Contractor by the CM during theconstruction stage..3Installing subcontractors are to date and initial the checklists asconstruction and verifications are completed..4The general contractor is to submit completed checklists to the CxA forreview and acceptance..5Once all documents have been reviewed and accepted the generalcontractor shall submit final commissioning documents in electronic form(PDF) and original signed copies.1.10COMMISSIONING SCHEDULE.1Submit preliminary Cx schedule in Gantt Chart format to CxA no later thanfour (4) weeks after award of contract. A sample Cx Schedule is providedin the Cx Manual..2Submit final Cx schedule in Gantt Chart format to CxA for review four (4)weeks prior to performance verification. A sample Cx Schedule is providedin the Cx Manual.

Upload your study docs or become a

Course Hero member to access this document

Upload your study docs or become a

Course Hero member to access this document

End of preview. Want to read all 19 pages?

Upload your study docs or become a

Course Hero member to access this document

Term
Fall
Professor
Kiki Ja
Tags
Project Management, Architect, Cx Manual

Newly uploaded documents

Show More

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture