NL Master Specification Guidefor Public Funded BuildingsSection 01 91 13.13 – Commissioning (Cx)Re-Issued 2022/10/11RequirementsPage 11 of 19.2Submit reports of performance verifications postponed due toseasonal, climatic, occupancy, or other reasons beyond theContractor’s control, promptly after execution of those services..6Ensure each form bears the required signatures as indicated on the form..7Submit as-built drawings, schematics, O&M manuals, maintenancematerials and warranties to CM for review..8Where structurally attached equipment is included in the scope of work,engage a third party Professional Structural Engineer, licensed to practicein the Province of Newfoundland and Labrador, for submission of stampedand signed shop drawings indicating acceptable mounting procedures forall equipment which is suspended, mounted or otherwise attached, as perSection 01 33 00 – Submittal Procedures. The Structural Engineer to alsoverify correct installation of the equipment.1.9COMMISSIONING DOCUMENTATION.1Refer to Section 01 91 13.16 - Commissioning (Cx) Forms forrequirements and instructions for use as well as the Cx Manual.2Checklists will be provided to the Contractor by the CM during theconstruction stage..3Installing subcontractors are to date and initial the checklists asconstruction and verifications are completed..4The general contractor is to submit completed checklists to the CxA forreview and acceptance..5Once all documents have been reviewed and accepted the generalcontractor shall submit final commissioning documents in electronic form(PDF) and original signed copies.1.10COMMISSIONING SCHEDULE.1Submit preliminary Cx schedule in Gantt Chart format to CxA no later thanfour (4) weeks after award of contract. A sample Cx Schedule is providedin the Cx Manual..2Submit final Cx schedule in Gantt Chart format to CxA for review four (4)weeks prior to performance verification. A sample Cx Schedule is providedin the Cx Manual.