Gms' % Cumulative weight retained Gms' % Passing Actual Permissible 20mm 95-100 10 mm 25-55 4.75 mm 0-10 2.36 mm f] Physical Inspection : ..................... i] Rounded. ...................................... ii] Flaky ........................................... iii] Containing organic matter .......... iv] Containing Dust/Powder. ............ Tested by : CONTRACTOR'S ENGINEER Remarks 1. Accepted .................................... 2. Acceptable subject to screening .............................. 3 Acceptable subject to washing ................................ 4. Rejected. ................................... Checked by: CLIENT/CONSULTANT
Image of page 26

Info icon This preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
UNNATTI CONSTRUCTIONS PVT. LTD . (ISO 9001:2000) 27 CONCRETE POUR CARD SL. NO. ................. DATE ..................... NAME OF CUSTOMER .............................. NAME OF WORK ............................... WORKSITE : ............... GRADE OF CONCRETE ............................... LOCATION OF CONCRETING ........................... REFERENCE DRAWING ............................... (WITH REV. NO.) SLUMP CEMENT RATIO ................................. INSPECTION ITEMS ................................. A) CEMENT B] SAND: C] METAL : Grade: Bulkage: Size/ Volume : Company : Silt Content: PPC/OPC/SRC : Volume: 1) CO-ORDINATES : 2) LEVEL : 3) SHUTTERING/CENTERING : 4) REINFORCEMENT STEEL : 5) INSERTS : 6) ANCHOR : 7) POCKETS/OPENING : 8) MEASUREMENT : 9) COVER TO REINFORCEMENT : 1) P.C.C. QUANTITY : 2) R.C.C. QUANTITY : 9) TIME OF COMMENCE EMENT : FROM : : TO: : 10) CEMENT CONSUMPTION : Estimated Actual BAGS : CUBE IDENTIFICATION NOS. : TEST REPORTS REF. : AUTHORISED TO POUR" ------------------------------- ---------------------------------- UNNATTI CONSTRUCTION CLIENT/CONSULTANT
Image of page 27
UNNATTI CONSTRUCTIONS PVT. LTD . (ISO 9001:2000) 28 CHECKLIST FOR CONCRETE 1 WATER : a] Clean & Potable Water source. b] Water supply for Mixer c] Curing arrangements with tap (nozzle) water supply. d] Curing Tank water supply. e] Water supply for laborers 2 CEMENT : a] Constant source & Grade b] Proper airtight storage godown with 2 doors. c] Proper storage of Mixer on Platform. d] Cement Bag weighing facilities. e] Calibration of weight balance (20+20+10 Kgs.) 3 FINE AGGREGATE : a] Constant source (check Sand Zone or FM) b] Washing facilities c] Screening facilities d] FA1 & FA2 separated by partition or separate bins. 4 COARSE AGGREGATE :
Image of page 28

Info icon This preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
UNNATTI CONSTRUCTIONS PVT. LTD . (ISO 9001:2000) 29 a] Constant source (ensure no Crusher Grit & Dust) b] CA1 & CA2 separate by partition or separate bins. 5. SAND BULKAGE TEST : a] Steel Measuring Box [Farma] watertight. b] Large [1.2 x 1.2 m] plastic sheet. c] Bucket of Water. d] Measuring Tape. e] Straight edge or ruler. 6. AGGREGATES BATCHING : a] Calibrated Weigh batcher with aggregates in bins b] Varying Measuring Boxes (Farmas] 12 Ns. c] Mixer Blackboard. 7. MIXER : a] Clean Hopper. b] Clean Drum c] Check Mixer Blades gaps [not greater than 30 mm] d] Check Hopper vibrator [adjust engine cum turn bcukle] e] Mixer calibrated tank. f] 2 x 200 litre drum full of water g] Tap supply under Mixer Operator's control h] 5 Litre "Bhisty" oil tin & 1 litre oil tin. i] Unloading Chute
Image of page 29
UNNATTI CONSTRUCTIONS PVT. LTD . (ISO 9001:2000) 30 j] Clean flat unloading steel platform or skip. 8. QUALITY CONTROL [QC] a] Lab Technician at Mixer point. b] Slump Cone with 16 mm dia. 600 mm long rod. c] 15 cm Cube Moulds, clean, all bolts - 6 Nos. 9 BUILDER'S HOIST : a] Braced with structure,. b] Skip Pit deep enough for 45 slope of mixer chute. c] Top pulley with extra tower frame for top 45 chute. d] Top platform for worker to tilt concrete skip.
Image of page 30

Info icon This preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
Image of page 31
This is the end of the preview. Sign up to access the rest of the document.

{[ snackBarMessage ]}

What students are saying

  • Left Quote Icon

    As a current student on this bumpy collegiate pathway, I stumbled upon Course Hero, where I can find study resources for nearly all my courses, get online help from tutors 24/7, and even share my old projects, papers, and lecture notes with other students.

    Student Picture

    Kiran Temple University Fox School of Business ‘17, Course Hero Intern

  • Left Quote Icon

    I cannot even describe how much Course Hero helped me this summer. It’s truly become something I can always rely on and help me. In the end, I was not only able to survive summer classes, but I was able to thrive thanks to Course Hero.

    Student Picture

    Dana University of Pennsylvania ‘17, Course Hero Intern

  • Left Quote Icon

    The ability to access any university’s resources through Course Hero proved invaluable in my case. I was behind on Tulane coursework and actually used UCLA’s materials to help me move forward and get everything together on time.

    Student Picture

    Jill Tulane University ‘16, Course Hero Intern