Unnatti Methodology and quality procedure.pdf

1 unnatti has a material manager at ho and his duties

Info icon This preview shows pages 10–13. Sign up to view the full content.

View Full Document Right Arrow Icon
1. UNNATTI has a Material Manager at H.O. and his duties will be to ensure that all bought out items are delivered on time. 2. UNNATTI shall maintain a regular follow up with the various supplies to ensure that he construction materials are delivered as per the technical requirements and that the delivery schedule is adhered to. 3. Regular inspection of key critical items will also be carried out by UNNATTI. With this we assure you to complete the project within the stipulated time with good quality.
Image of page 10

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
UNNATTI CONSTRUCTIONS PVT. LTD . (ISO 9001:2000) 11 H. QUALITY STANDARD We have a Quality Control System to meet with the stringent requirement of quality which is followed by us for all the jobs carried out by us. We have a separate Quality Assurance Division reporting to top Management who will ensure that the Quality Control measures are taken in all stages of construction. We shall install this facility at site to test various materials as well as the samples of concrete cubes required by the standard. Parallel for the fabrication work, we have dedicated persons to ensure that the quality standards are adhered to for fabrication, welding and erection. Thus the quality of work is maintained in all works undertaken by us which requires quality standards of multinationals. I. SAFETY : All workers shall be provided with necessary protective & safety equipments in the form of Helmets, Hand gloves, Safety Belts, welders’ goggles, masks etc. by us at site. We shall maintain at all time FIRST-AID BOX at site. Housekeeping shall be carried out regularly. We shall put Caution Sign Board and tape in the vicinity of work place.
Image of page 11
UNNATTI CONSTRUCTIONS PVT. LTD . (ISO 9001:2000) 12 J. WELFARE ARRANGEMENT: 1) Weekly day of rest: Every worker shall be given a weekly day of rest, which shall normally be a Sunday unless fixed and notified in advance. A worker shall not be required to work on weekly rest day unless he has or will have a substituted rest day, on one of the five days immediately before or after the rest day provided that no substitution shall be made which will result in the worker working for more than ten days consecutively without a rest day for a whole day. 2) Accommodation for labour: During the progress of works, the workers will be provided necessary living accommodation and ancillary facilities as follows: a) A hut of Area of 64 sft. Inclusive of cooking place with minimum height 7'-0" at each level with a cooking place adjacent to the hut for each family. b) Temporary latrines and urinals for the use of workers at the rate of four per each one hundred of the total strength. c) Temporary bathing and washing places suitably screened one unit for every 25 persons residing in the camp. 3) Drinking Water: In every work place, there shall be provided and maintained at suitable places easily accessible to the workers a sufficient supply of water fit for drinking.
Image of page 12

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
Image of page 13
This is the end of the preview. Sign up to access the rest of the document.

{[ snackBarMessage ]}

What students are saying

  • Left Quote Icon

    As a current student on this bumpy collegiate pathway, I stumbled upon Course Hero, where I can find study resources for nearly all my courses, get online help from tutors 24/7, and even share my old projects, papers, and lecture notes with other students.

    Student Picture

    Kiran Temple University Fox School of Business ‘17, Course Hero Intern

  • Left Quote Icon

    I cannot even describe how much Course Hero helped me this summer. It’s truly become something I can always rely on and help me. In the end, I was not only able to survive summer classes, but I was able to thrive thanks to Course Hero.

    Student Picture

    Dana University of Pennsylvania ‘17, Course Hero Intern

  • Left Quote Icon

    The ability to access any university’s resources through Course Hero proved invaluable in my case. I was behind on Tulane coursework and actually used UCLA’s materials to help me move forward and get everything together on time.

    Student Picture

    Jill Tulane University ‘16, Course Hero Intern