Running the Oracle ORAchk Upgrade Readiness A Using CVU to

Running the oracle orachk upgrade readiness a using

This preview shows page 10 - 12 out of 348 pages.

Running the Oracle ORAchk Upgrade Readiness Assessment 11-11 Using CVU to Validate Readiness for Oracle Clusterware Upgrades 11-11 About the CVU Upgrade Validation Command Options 11-11 Example of Verifying System Upgrade Readiness for Grid Infrastructure 11-13 Understanding Rolling Upgrades Using Batches 11-13 Performing Rolling Upgrade of Oracle Grid Infrastructure 11-13 Upgrading Oracle Grid Infrastructure from an Earlier Release 11-14 Completing an Oracle Clusterware Upgrade when Nodes Become Unreachable 11-16 Joining Inaccessible Nodes After Forcing an Upgrade 11-17 Changing the First Node for Install and Upgrade 11-17 About Upgrading Oracle Grid Infrastructure Using Rapid Home Provisioning 11-17 Applying Patches to Oracle Grid Infrastructure 11-18 About Individual Oracle Grid Infrastructure Patches 11-19 About Oracle Grid Infrastructure Software Patch Levels 11-19 Patching Oracle Grid Infrastructure to a Software Patch Level 11-19 Applying Patches During an Oracle Grid Infrastructure Installation or Upgrade 11-20 Updating Oracle Enterprise Manager Cloud Control Target Parameters 11-21 Updating the Enterprise Manager Cloud Control Target After Upgrades 11-21 Updating the Enterprise Manager Agent Base Directory After Upgrades 11-21 Registering Resources with Oracle Enterprise Manager After Upgrades 11-22 Unlocking and Deinstalling the Previous Release Grid Home 11-23 Checking Cluster Health Monitor Repository Size After Upgrading 11-24 Downgrading Oracle Clusterware to an Earlier Release 11-24 Options for Oracle Grid Infrastructure Downgrades 11-25 Restrictions for Oracle Grid Infrastructure Downgrades 11-26 Downgrading Oracle Standalone Cluster to 12c Release 2 (12.2) 11-26 Downgrading Oracle Domain Services Cluster to 12c Release 2 (12.2) 11-28 Downgrading Oracle Member Cluster to 12c Release 2 (12.2) 11-31 Downgrading Oracle Grid Infrastructure to 12c Release 2 (12.2) when Upgrade Fails 11-33 Downgrading to Oracle Grid Infrastructure 12c Release 1 (12.1) 11-34 Downgrading to Oracle Grid Infrastructure 11g Release 2 (11.2) 11-36 Downgrading Oracle Grid Infrastructure Using Online Abort Upgrade 11-37 Completing Failed or Interrupted Installations and Upgrades 11-38 Completing Failed Installations and Upgrades 11-39 Continuing Incomplete Upgrade of First Nodes 11-39 Continuing Incomplete Upgrades on Remote Nodes 11-40 x
Image of page 10
Continuing Incomplete Installation on First Node 11-40 Continuing Incomplete Installation on Remote Nodes 11-41 Converting to Oracle Extended Cluster After Upgrading Oracle Grid Infrastructure 11-42 12 Removing Oracle Database Software About Oracle Deinstallation Options 12-2 Oracle Deinstallation (Deinstall) 12-3 Deinstallation Examples for Oracle Database 12-5 Deinstallation Response File Example for Oracle Grid Infrastructure for a Cluster 12-6 Migrating Standalone Oracle Grid Infrastructure Servers to a Cluster 12-9 Relinking Oracle Grid Infrastructure for a Cluster Binaries 12-11 Changing the Oracle Grid Infrastructure Home Path 12-12 Unconfiguring Oracle Clusterware Without Removing Binaries 12-13 Unconfiguring Oracle Member Cluster 12-14 A
Image of page 11
Image of page 12

You've reached the end of your free preview.

Want to read all 348 pages?

  • Spring '09
  • Jane Smith
  • Oracle Database, Oracle Corporation, Oracle software, Oracle Grid Infrastructure

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture