The PLMN elements are illustrated in order to provide better connection of

The plmn elements are illustrated in order to provide

This preview shows page 12 - 14 out of 19 pages.

services that are based on PSTN and ISDN. The PLMN elements are illustrated in order toprovide better connection of external networking systems. Universal Telecommunication Radio Access (UTRA):The radio access approaches and techniques were developed in 1998 January to make decisionsregarding ETSI and combine this with UMTS. These both technologies are paired with bands ofspectrum W-CDMA unpaired system. The TD-CDMA is developed with the common ideas andstandards. Furthermore, this approach has ensured the operating environment to provideoptimum solution of all services that are needed to develop effective approaches. In addition to that, the UTRA’s transmission rate capability will ensure to provide mobilityapplication at least 144 Kbit/s in every condition of environment system. On the other hand, 384Kbit/s is particularly low from the mobility application that will impact on the microenvironmental system. For short range usage, 2.048 Mbit/s will packet application and spectrumavailability will be ensured b the network planning system. In radio network planning thestrategies are developed and these strategies are depending on the cellular environment. UTRAN Architecture:The radio Network Sub-system is consisting on the UTRAN system of RNC. The sub-networkthat is involved in UTRAN and RNS has provided more Node Bs. The lub interface hasconnected the RNCs and Node to compare the releasing 7 study works. Co-located RNC ismeaning to utilize the RNSs small which will support the flat architecture and functionality ofNode B. furthermore, the overlapping process of sector 3 will frequently different from the radiocontrolling network. The radio network controller RNC is consisting of the CN that is normallycontrolling resources of radio UTRAN. Moreover, the GSM and BSC have correspondinglyinterfaced with terminating sources. The CRNC is responsible to provide congestion and loadcells to control the code which is allocated in admission code. Basically, the radio resourcemanagement operations are mapping parameters of radio access bearer RAB that can interfacewith air transport parameter channels. The SRNC can affect Node B and CRNC is connectedwith UTRAN and provide effective connecting between SRNC and UTRAN.
Image of page 12
FINAL REPORT13Network Planning and development Process:The network planning and development process is basically dealing with the capacity of requestand translating services to implement the procedural plans. Moreover, the functions of networkplanning and development process are covering network capabilities and descriptive services thatare introduced in new planning procedures. Furthermore, the additional equipment is feasible toupgrade the request that is coming from the allocation of resources and validation of request.This planning process ensures that network to install, manage and control the billed networkingprocedures. Moreover, the request that are implementing in the estimation of contract capacity.To operate a network in effective manner this is essential to improve sub-contract capabilitiesand capacities. The Node B:
Image of page 13
Image of page 14

You've reached the end of your free preview.

Want to read all 19 pages?

  • Fall '16
  • qalab e abbas
  • Cellular network, Universal Mobile Telecommunications System, Universal Mobile Telecommunication System

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture