Utility Criteria 1 No existing utilities and services and has known

Utility criteria 1 no existing utilities and services

This preview shows page 9 - 13 out of 18 pages.

Utility Criteria 1 – No existing utilities and services and has known difficulties of access on site 2 – No existing utilities and services but is far from the site 3 - No existing utilities and services but is accessible near the site 4 - No existing utilities and services are available adjacent to or near the site 5 - No existing utilities and services are available within the site Site Drainage Criteria 1 – Site in proximity to hazards 2 – Site in proximity to three or more hazards 3 – Site in proximity to two hazards 4 – Site in proximity to one hazard 5 – Site free of any potential damage Climate Criteria 1 – The site has irregular dry and wet season 2 – Site experiences greater wet season than drys eason
Image of page 9
A Proposed 50 – Bed Hospital 3 - Site experiences greater dry season than wet season 4 – Site has fair climate and weather condition 5 – Site has good climate and weather condition Orientation Criteria 1 – The site does not have a good sun and wind orientation 2 – The site has satisfactory sun and wind orientation 3 – The site has good sun orientation but satisfactory wind orientation 4 – The site has both good sun and wind orientation 5 – The site has both excellent sun and wind orientation Existing Vegetation Criteria 1- The site has no existing vegetation 2- The site has 10 % existing vegetation 3- The site has 20 % existing vegetation 4- The site has 30% existing vegetation 5- The site has 40% existing vegetation Natural Hazard Criteria 1- Site in proximity to hazards 2- Site is in proximity to three or more hazards 3- Site is in proximity to two hazards 4- Site is in proximity to one hazard 5- Site free of any potential damage Future Expansion Criteria 1 – Site has no potential for future expansion 2 – Relevant variances are approved to future expansion 3 – Some variances are approved to future expansion 4 – Has enough area for additional amenities for the property development 5 – Has larger area for additional amenities for the property development SITE SELECTION CRITERIA CRITERIA % MATINA CROSSING ADGAO BUHANGIN Environmental 65 Lot Area 5 5 5 5 Accessibility 5 5 5 3 Utility 5 5 5 4 Site Drainage 5 4 5 5 Topography 5 5 4 3 Climate 5 5 4 5 Orientation 5 5 5 5 Existing Vegetation 5 5 3 2 Free from Noise Pollution 5 4 3 2 Free from dust, 5 5 3 3
Image of page 10
A Proposed 50 – Bed Hospital smoke, or foul odor Not susceptible to natural disasters such as flooding or landslide 5 3 3 5 Not located adjacent to railroads, freight yards, children’s playground, airports, industrial plants, disposal plants 5 5 5 3 Natural Surveillance 5 5 4 4 Future Expansion 2.5 2.5 1 1 Socio-economic and Cultural Factor 35 Site Potential 7 7 7 5 Accessibility to major roads 7 7 7 7 Must be within Urban Area 7 7 7 4 Accessibility to important existing facilities 7 7 7 4 Pedestrian Access and Circulation 7 7 7 7 TOTAL 100 98.5 90 81 2.2 SITE SELECTION PROCESS The 3 sites that have been chosen suitable for the project are sites from Matina Crossing, Agdao, and Buhangin. These locations were tailored-fit to the accuracy of the given criteria.
Image of page 11
A Proposed 50 – Bed Hospital SITE A Purok Curoy, Agdao, Davao City Site Profile Location: Purok Curoy, Agdao, Davao City Land Area: 5,028.16 m² (54,122.62 ft²) Modes of Transportation: Bus, PUVs, Jeepneys, Private Vehicles, Taxis Accessibility
Image of page 12
Image of page 13

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture