Utility Criteria
1 – No existing utilities and services and has known difficulties of access on
site
2 – No existing utilities and services but is far from the site
3 - No existing utilities and services but is accessible near the site
4 - No existing utilities and services are available adjacent to or near the site
5 - No existing utilities and services are available within the site
Site Drainage Criteria
1 – Site in proximity to hazards
2 – Site in proximity to three or more hazards
3 – Site in proximity to two hazards
4 – Site in proximity to one hazard
5 – Site free of any potential damage
Climate Criteria
1 – The site has irregular dry and wet season
2 – Site experiences greater wet season than drys eason

A Proposed 50 – Bed Hospital
3 - Site experiences greater dry season than wet season
4 – Site has fair climate and weather condition
5 – Site has good climate and weather condition
Orientation Criteria
1 – The site does not have a good sun and wind orientation
2 – The site has satisfactory sun and wind orientation
3 – The site has good sun orientation but satisfactory wind orientation
4 – The site has both good sun and wind orientation
5 – The site has both excellent sun and wind orientation
Existing Vegetation Criteria
1-
The site has no existing vegetation
2-
The site has 10 % existing vegetation
3-
The site has 20 % existing vegetation
4-
The site has 30% existing vegetation
5-
The site has 40% existing vegetation
Natural Hazard Criteria
1-
Site in proximity to hazards
2-
Site is in proximity to three or more hazards
3-
Site is in proximity to two hazards
4-
Site is in proximity to one hazard
5-
Site free of any potential damage
Future Expansion Criteria
1 – Site has no potential for future expansion
2 – Relevant variances are approved to future expansion
3 – Some variances are approved to future expansion
4 – Has enough area for additional amenities for the property development
5 – Has larger area for additional amenities for the property development
SITE SELECTION CRITERIA
CRITERIA
%
MATINA
CROSSING
ADGAO
BUHANGIN
Environmental
65
Lot Area
5
5
5
5
Accessibility
5
5
5
3
Utility
5
5
5
4
Site Drainage
5
4
5
5
Topography
5
5
4
3
Climate
5
5
4
5
Orientation
5
5
5
5
Existing
Vegetation
5
5
3
2
Free from Noise
Pollution
5
4
3
2
Free from dust,
5
5
3
3

A Proposed 50 – Bed Hospital
smoke, or foul
odor
Not susceptible
to
natural
disasters such
as flooding or
landslide
5
3
3
5
Not
located
adjacent
to
railroads, freight
yards, children’s
playground,
airports,
industrial plants,
disposal plants
5
5
5
3
Natural
Surveillance
5
5
4
4
Future
Expansion
2.5
2.5
1
1
Socio-economic
and
Cultural
Factor
35
Site Potential
7
7
7
5
Accessibility to
major roads
7
7
7
7
Must be within
Urban Area
7
7
7
4
Accessibility to
important
existing facilities
7
7
7
4
Pedestrian
Access
and
Circulation
7
7
7
7
TOTAL
100
98.5
90
81
2.2
SITE SELECTION PROCESS
The 3 sites that have been chosen suitable for the project are sites from
Matina Crossing, Agdao, and Buhangin. These locations were tailored-fit to
the accuracy of the given criteria.

A Proposed 50 – Bed Hospital
SITE A
Purok Curoy, Agdao, Davao City
Site Profile
Location:
Purok Curoy, Agdao, Davao City
Land Area:
5,028.16 m² (54,122.62 ft²)
Modes of Transportation:
Bus, PUVs, Jeepneys, Private Vehicles, Taxis
Accessibility

