Maintenance Planning is the process conducted to translate the maintenance

Maintenance planning is the process conducted to

This preview shows page 7 - 9 out of 9 pages.

5) Maintenance Planning is the process conducted to translate the maintenance approach stated in the system operational requirement into maintenance task requirements that ensure the ongoing availability of the system. [Describe Maintenance Planning] TrueFalse 6) The goals of supportability analyses are to ensure that supportability is included as a system performance requirement and to ensure the system is concurrently developed or acquired with the optimal support system and infrastructure [Define Supportability Analysis]
Image of page 7
7) Components of maintainability are modularity, accessibility, testability and________________________. [Describe maintainability analysis,modeling, allocation and prediction.][Remediation Accessed :N] 8) Highly reliable and maintainable systems require less (frequency and duration) unscheduled/ corrective maintenance which can translate into reduced life cycle costs. [Explain the relationship between R&M, availability and life cycle cost parameters] 9) The_______________________________ is a standard that specifies the information exchange requirements for most materiel management functions commonly performed in supporting international projects. [Describe S1000D, S2000M, S3000L, S4000M, SX0001]S2000MGEIA-STD-0007MIL-STD-882DCJCSI 3170.01G1) The ______________________ are (is) a measure of system Supportability as it relates tothe inherent system design as well as the efficiency and effectiveness of external logisticssupport. Sustainment KPP/KSAs
Image of page 8
Production Goals Budget Objectives Logistics Management Information 2) The ___________________________ is the evaluation of the performance, operational effectiveness, operational suitability and estimated costs of alternative systems being considered to meet a mission capability. Requirements and their impact on Supportability Analysis] Accessed :N] Analysis of Alternatives (AoA) Market Research Maintenance Concept Initial Capabilities Document 3) Maintainability prediction commences early in system design. [Describe maintainability analysis, modeling, allocation and prediction.]False 1) After the Materiel Development Decision (MDD), the Analysis of Alternatives (AoA) is initiated to examine potential materiel solutions with the goal of identifying the most promising end-state materiel solution.[Describe the Sources of Operational Support Requirements and their impact on Supportability Analysis]
Image of page 9

You've reached the end of your free preview.

Want to read all 9 pages?

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture