return remains. Payback rules are commonly used in such cases. Finally, realistic cost/benefit analysis along the lines indicated should definitely be used by the U.S. government and would go a long way toward balancing the budget! 8. The statement is false. If the cash flows of Project B occur early and the cash flows of Project A occur late, then for a low discount rate the NPV of A can exceed the NPV of B. Observe the following example. C 0 C 1 C 2 IRR NPV @ 0% Project A –$1,000,000 $0 $1,440,000 20% $440,000 Project B –$2,000,000 $2,400,000 $0 20% 400,000 However, in one particular case, the statement is true for equally risky projects. If the lives of the two projects are equal and the cash flows of Project B are twice the cash flows of Project A in every time period, the NPV of Project B will be twice the NPV of Project A. 9. Although the profitability index (PI) is higher for Project B than for Project A, Project A should be chosen because it has the greater NPV. Confusion arises because Project B requires a smaller investment than Project A. Since the denominator of the PI ratio is lower for Project B than for Project A, B can have a higher PI yet have a lower NPV. Only in the case of capital rationing could the company’s decision have been incorrect.
Image of page 141
CHAPTER 7 B-142 10. a. Project A would have a higher IRR since initial investment for Project A is less than that of Project B, if the cash flows for the two projects are identical. b. Yes, since both the cash flows as well as the initial investment are twice that of Project B. 11. Project B’s NPV would be more sensitive to changes in the discount rate. The reason is the time value of money. Cash flows that occur further out in the future are always more sensitive to changes in the interest rate. This sensitivity is similar to the interest rate risk of a bond. 12. The MIRR is calculated by finding the present value of all cash outflows, the future value of all cash inflows to the end of the project, and then calculating the IRR of the two cash flows. As a result, the cash flows have been discounted or compounded by one interest rate (the required return), and then the interest rate between the two remaining cash flows is calculated. As such, the MIRR is not a true interest rate. In contrast, consider the IRR. If you take the initial investment, and calculate the future value at the IRR, you can replicate the future cash flows of the project exactly. 13. The statement is incorrect. It is true that if you calculate the future value of all intermediate cash flows to the end of the project at the required return, then calculate the NPV of this future value and the initial investment, you will get the same NPV. However, NPV says nothing about reinvestment of intermediate cash flows. The NPV is the present value of the project cash flows. What is actually done with those cash flows once they are generated is not relevant. Put differently, the value of a project depends on the cash flows generated by the project, not on the future value of those cash flows. The fact that the reinvestment “works” only if you use the required return as the reinvestment
Image of page 142
Image of page 143

You've reached the end of your free preview.

Want to read all 253 pages?

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture