Unnatti Methodology and quality procedure.pdf

Name signature unnatti engineer client consultant

Info icon This preview shows pages 33–38. Sign up to view the full content.

View Full Document Right Arrow Icon
Name Signature UNNATTI Engineer : _________________ ______________________ Client / Consultant Engineer : _______________ _______________________
Image of page 33

Info icon This preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
UNNATTI CONSTRUCTIONS PVT. LTD . (ISO 9001:2000) 34 CHECK LIST FOR EXTERNAL PLASTER Project : _______________ Building Name : ______________ Location : _________ 1st Coat : 1] Clear upto 1' - 0" below P.L. including leveling the area ............................. 2] Erecting Double Scaffolding /H. Frame scaffolding ................................... 3] Availability of Mixer Machine .................................................................... 4] Availability of Mortar Trays at respective floors ....................................... 5] Marble cill in window opening fixed before hand. ..................................... 6] Concrete coping completed on parapet walls ............................................... 7] Level Pad [DHADAS] given on wall .......................................................... 8] "Line Dori" fixed on corners ......................................................................... 9] Adequate Hacking ext. RCC Surface ......................................................... 10] Building of concrete to chip off 11] Plumbing /Soil line holes made 12] Groove/Pattas [if any] detail obtained from Architect 13] Chajja level and terrace level in order 14] Slab closed from top in duct area as instructed 15] Fungus and dirt cleaned 16] Masonry joints, if left over, to fill with Cement mortar 17] Joints between top layer of Masonry and beam bottom to fill with mortar 18] Cement of proper grading available 19] Sand in required fineness available 20] Exposed steel covered with concrete 21] Chicken mesh to fix at junction of Masonry and RCC 22] Wall moistened well in advance [Tarai]
Image of page 34
UNNATTI CONSTRUCTIONS PVT. LTD . (ISO 9001:2000) 35 23] Empty gunny bags to lay adjacent to plinth wall to collect fallen mortar 24] Plaster to start from Parapet inside at 1'-0" above terrace level. 25] Window opening sealed [if tiling work etc. is done inside] wide plastic etc. 2nd Coat : 1] Enough curing is done to 1st coat 2] Sufficient time gap [2 days] is given between two coats 3] Sand of proper fineness available 4] Waterproofing compound available for 2nd coat 5] Plastering machine (Gudgudi) available Name Signature UNNATTI ENGG. ______________________ ________________________ Client / Consultant Engineer : ______________ ________________________
Image of page 35

Info icon This preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
UNNATTI CONSTRUCTIONS PVT. LTD . (ISO 9001:2000) 36 CHEK LIST OF TERRACE WATERPROOFING [A] Brick Bat Coba : Date : Project : _______________ Building Name : ______________ Location : _________ 1] Surface cleaned absolutely including removal of fungus. [if necessary with wire brush] .... 2] Chipped off set Mortar 3] Hacked for any requiring injection grouting 4] Nos. of R.W.P. or as per area [Soft/pipe of 4" dia.] 5] Jamming R.W./Plumbing outlets with concrete. 6] Exposed steel to cover with concrete [if any] 7] Ridges and slopes finalized as per drawings 8] Correct size & quality of Brick bats 9] Use of W.P. Compound 10] Correct proportion of mortar as specified 11] Cement of not more than 43 grade Name Signature UNNATTI ENGG. _______________________ ________________________ Client / Consultant Engineer : ______________ ________________________
Image of page 36
UNNATTI CONSTRUCTIONS PVT. LTD . (ISO 9001:2000) 37 CHEK LIST OF TOILET WATER PROOFING - PART - 1 1st Coat of Plastering - Part - A : Project : _______________ Building Name : ______________ Location : _________ 1] Sunk portion totally cleaned of debris/fungus. 2] Leakage if any to be checked & grouted. Before Waterproof Plaster 3] Openings for plumbing outlet to be completed. 4] Check about availability of WP material. CHECK LIST FOR TOILET WATERPROOFING - PART B : Brick Bar Coba & 2nd Coat of Plaster: 1] All plumbing wall is in order ................................... : 2] The area is clean of all the debris/fungus .................... : 3] Proper sizes/quality of Brick Bat available ................. : 4] Waterproofing compound available .......................... : 5] Provision/Pipe of wash basin toilet laid : ..................
Image of page 37

Info icon This preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
Image of page 38
This is the end of the preview. Sign up to access the rest of the document.

{[ snackBarMessage ]}

What students are saying

  • Left Quote Icon

    As a current student on this bumpy collegiate pathway, I stumbled upon Course Hero, where I can find study resources for nearly all my courses, get online help from tutors 24/7, and even share my old projects, papers, and lecture notes with other students.

    Student Picture

    Kiran Temple University Fox School of Business ‘17, Course Hero Intern

  • Left Quote Icon

    I cannot even describe how much Course Hero helped me this summer. It’s truly become something I can always rely on and help me. In the end, I was not only able to survive summer classes, but I was able to thrive thanks to Course Hero.

    Student Picture

    Dana University of Pennsylvania ‘17, Course Hero Intern

  • Left Quote Icon

    The ability to access any university’s resources through Course Hero proved invaluable in my case. I was behind on Tulane coursework and actually used UCLA’s materials to help me move forward and get everything together on time.

    Student Picture

    Jill Tulane University ‘16, Course Hero Intern