If the government is primarily concerned with

This preview shows page 1 - 3 out of 3 pages.

2) If the Government is primarily concerned with managing the total program, then the contractor's primary concern is: [Recognize the roles and responsibilities of the Government and the contractor in a typical SE Process.]Designing and developing the system Developing system-level objectives Determining tradeoffs between budget, schedule, and performance objectives Translating user operational needs into contract specifications
3) In which phase are systems-level requirements stabilized and detailed designs developed based on these requirements? [Identify the SE activities that are integrated throughout the life cycle.]
Production and Deployment Technology Development 4) Which document contains a format for the Systems Engineering Plan (SEP)? [Recall the development of a Systems Engineering Plan (SEP).]

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture