6 far 15403 1b are there any exceptions to submission

This preview shows page 34 - 37 out of 43 pages.

6.FAR 15.403-1(b)Are there any exceptions tosubmission of certified cost orpricing data pursuant to FAR15.403-1(b)? If so, is supportingdocumentation included in theproposal? (Note questions 18-20.)7.FAR 15.408,Table 15-2,Section IParagraphC(2)(i)Does the proposal disclose thejudgmental factors applied andthe mathematical or othermethods used in the estimate,including those used in projectingfrom known data?8.FAR 15.408,Table 15-2,Section IParagraphC(2)(ii)Does the proposal disclose thenature and amount of anycontingencies included in theproposed price?9.FAR 15.408 Table15-2, Section II,Paragraph A or BDoes the proposal explain thebasis of all cost estimatingrelationships (labor hours ormaterial) proposed on other thana discrete basis?10.FAR 15.408,Table 15-2,Section IParagraphs Dand EIs there a summary of total cost byelement of cost and are theelements of cost cross-referencedto the supporting cost or pricingdata? (Breakdowns for each costelement must be consistent withyour cost accounting system,including breakdown by year.)11.FAR 15.408,Table 15-2,Section IIf more than one Contract LineItem Number (CLIN) or subContract Line Item Number (sub-CON 270DAY 134
REFERENCESSUBMISSIONITEMPROPOSALPAGE No.If not providedEXPLAIN (mayusecontinuationpages)Paragraphs Dand ECLIN) is proposed as required bythe RFP, are there summary totalamounts covering all line itemsf o reach element of cost and is itcross-referenced to the supportingcost or pricing data?12.FAR 15.408,Table 15-2,Section IParagraph FDoes the proposal identify anyincurred costs for work performedbefore the submission of theproposal?13.FAR 15.408,Table 15-2,Section IParagraph GIs there a Government forwardpricing rate agreement (FPRA)? Ifso, the offeror shall identify theofficial submittal of such rate andfactor data. If not, does theproposal include all rates andfactors by year that are utilized inthe development of the proposaland the basis for those rates andfactors?COST ELEMENTSMATERIALS AND SERVICES14.FAR 15.408,Does the proposal include aTable 15-2,consolidated summary ofSection IIindividual material and services,Paragraph Afrequently referred to as aConsolidated Bill of Material(CBOM), to include the basis forpricing? Theofferor’sconsolidated summary shallinclude raw materials, parts,components, assemblies,subcontracts and services to beproduced or performed by others,identifying as a minimum theitem, source, quantity, and price.SUBCONTRACTS (Purchased materials or services)15.DFARS 215.404-3Has the offeror identified in theproposal those subcontractorproposals, for which thecontracting officer has initiatedor may need to request fieldpricing analysis?CON 270DAY 135
REFERENCESSUBMISSIONITEMPROPOSALPAGE No.If not providedEXPLAIN (mayusecontinuationpages)16.FAR 15.404-3(c)Per the thresholds of FAR 15.404-3(c), Subcontract PricingConsiderations, does the proposalinclude a copy of the applicablesubcontractor’scertified cost orpricing data?FAR 52.244-2

Upload your study docs or become a

Course Hero member to access this document

Upload your study docs or become a

Course Hero member to access this document

End of preview. Want to read all 43 pages?

Upload your study docs or become a

Course Hero member to access this document

Term
Spring
Professor
N/A
Tags

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture