Gules Fit Outdoor Training Studio.docx

Evaluation methods both evaluation methods will be

Info icon This preview shows pages 2–4. Sign up to view the full content.

View Full Document Right Arrow Icon
Evaluation Methods
Image of page 2

Info icon This preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
Both evaluation methods will be used on this project, quantitative or qualitative data, because both provide important information for evaluation and community engagement, they provide the best overview of the project. Everybody involved on the project will be updated for every change that may happen along the project till the deadline, not only that but as well meetings must be done often to keep everybody on same pace. Contingency Plan Plan in case of delay on the project, which can happen. Staff back up, equipment back up, even facility back up and this one it’s the most important one, cause it’s an outdoor gym and due to weather a covered place is the best option, a short way to solve the problem is to offer a covered place to the clients, long term it’s to build a total covered place so the client can decide where he wants to have their class. Project Progress Time to time a meeting to check the progress of the project will be held, and checked with the milestone set previously at the beginning of the project. Checking what happened and why it’s a way keep everything on tracks, people on charge will need to explain why a change happen on the project, but everything must keep as the original plan. Any need to additional resources must be indicating earlier and all possibilities to be done within the original resource offered have to be studied. Financial control
Image of page 3
All spends must be reported and keep checking with original financial plan, any extra spend must be detailed and explained why happened. Evaluation The project ran well, besides some conflicts that happened but everything were solved and the project could be delivered on time. The satisfaction of all involved on the project were high. Self-evaluation Besides the project was a success an improvement must be taken in consideration, mainly on the part of coordinate people, being hard to handle some times with some conflicts which arouse inside the project.
Image of page 4
This is the end of the preview. Sign up to access the rest of the document.

{[ snackBarMessage ]}

What students are saying

  • Left Quote Icon

    As a current student on this bumpy collegiate pathway, I stumbled upon Course Hero, where I can find study resources for nearly all my courses, get online help from tutors 24/7, and even share my old projects, papers, and lecture notes with other students.

    Student Picture

    Kiran Temple University Fox School of Business ‘17, Course Hero Intern

  • Left Quote Icon

    I cannot even describe how much Course Hero helped me this summer. It’s truly become something I can always rely on and help me. In the end, I was not only able to survive summer classes, but I was able to thrive thanks to Course Hero.

    Student Picture

    Dana University of Pennsylvania ‘17, Course Hero Intern

  • Left Quote Icon

    The ability to access any university’s resources through Course Hero proved invaluable in my case. I was behind on Tulane coursework and actually used UCLA’s materials to help me move forward and get everything together on time.

    Student Picture

    Jill Tulane University ‘16, Course Hero Intern