Which of the following describes a work breakdown structure WBS Select one a

Which of the following describes a work breakdown

This preview shows page 13 - 14 out of 14 pages.

Which of the following describes a work breakdown structure (WBS)? Select one:a. All of the answersb. If the work is not listed in the WBS, it is not in the projectc. The accumulation of the work in the WBS should be equal to the work of the projectd. The work should be decomposed to a realistic level of detail A WBS includes all the work in the project. If it is not listed in the WBS, it’s not part of the project. A WBSshould be decomposed to a realistic level of detail. Not breaking it down sufficiently opens the way forwork to slip through the cracks. Breaking it down into too much detail can result in micro-management.The work listed in the WBS should exactly correspond to the work that is in the project. [CrosswindManual 5.4; PMBOK® Guide 5.4] The correct answer is: All of the answers Which of the following is a heuristic for WBS decomposition?
Image of page 13
7/22/2018 Scope Practice Exam (30 Questions) 14/14 Question 28 Correct Mark 1.00 out of 1.00 Question 29 Incorrect Mark 0.00 out of 1.00 Question 30 Incorrect Mark 0.00 out of 1.00 Which of the following is the tool or technique the project manager will use in the process of creating aWBS?
Image of page 14

You've reached the end of your free preview.

Want to read all 14 pages?

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture