(CRAFT//..) (N=10 - 50) 3. Large Size Problems (Most Practical): Computer Simulation. (Special Language: GPSS) (N > 50)
Image of page 39

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
Service Operations Layout- I Office (Service) Layouts: Recent Poll: A 1400 service worker poll revealed that 75% felt a better layout would improve their productivity Management indirectly used layout as a “spatial language” to say: You are special? Out of supervisor’s watchful eyes/ Satisfied social needs Proximity : The unusual approach is to design office layouts around work flows and communication patterns The assumption is that proximity helps with understanding, mutual interest, and even friendship Privacy: Crowding and noise can hurt performance and attitudes
Image of page 40
Service Operations Layout- II Options in office layout Privacy is expensive. The capital investment in open-plan layouts is about 40% less. An open plan maximizes flexibility. A trade-off between privacy and proximity is possible. Traditional layouts: Closed offices for some Open areas for others Office landscaping Everyone in the open: plants, screens, and portable participations for semiprivate space Activity settings Home based: a personal nook; position mo longer means place Multiple workplaces Telecommuting or electronic cottage
Image of page 41

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
Product Layout Design Line layout: * all work stations are located along production line in a pre-specified sequence. * a series of operations performed in the same order. * a transportation device connection all WSs to form a line * all machines are dedicated to perform certain operations tasks. Design questions: * how many work stations in the line? * how operation tasks are assigned to each work station? There is no relative position issue in line layout design.
Image of page 42
Layout Types (b) Product (Line) Layout (b) Product (Line) Layout Station 1 Station 2 Station 3 Station 4
Image of page 43

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
Image of page 44
In a Hospital for an Medical Exam Receptionist Sign Up Temperature Height/Weight Blood Pressure Blood By A RN By A D.A -------- See Doctor Exit Pre-Check Up Sample Taken Test- 1 Test- 2 Test- 3 Entrance It is a Line-Layout
Image of page 45

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
In an Museum Entrance Showroom 1 Showroom 2 Showroom 3 Showroom 6 Showroom 5 Showroom 4 Showroom 7 Showroom 8 Showroom 9 Exit Gift Shop It is a Line-Layout
Image of page 46
Why Line Need Be Balanced? Example: Tasks: A B C D E F G H I J Op.time: 2 3 9 1 14 16 4 1 7 13 Work station: (1) (2) (3) (4) (5) Precedence requirement: A—B—C—D—E—F—G—H—I--J Initial assignment: Tasks: (A,B) (C,D) (E,F) (G,H) (I,J) WSs: (1) (2) (3) (4) (5) Question: how about the performance of this production line?
Image of page 47

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
Initial Assignment : Tasks: (A,B) (C,D) (E,F) (G,H) (I,J) WS : (1) (2) (3) (4) (5) Process time: 5 10 30 5 20 Idle time: 25 20 0 25 10 1. Shortest Time Interval a Finished Product out off Line = 30 2. Stable Output Rate of this Line = 2/hour 3. Idle (Slack) Time at Each WS ( 25+20+0 +25+10=80) 4. Total Slack Time of the Line = 80 5. Is this Line Balanced ? No
Image of page 48
New Assignment : Tasks: (A,B,C) (D,E) (F) (G,H,I) (J) WS : (1) (2) (3) (4) (5) Process time: 14 15 16 12 13 Idle time: 2 1 0 4 3 1. Shortest Time Interval a Finished Product out off Line = 16 2. Stable Output Rate of this Line = 4/hour 3. Idle (Slack) Time at Each WS (2+1+0 +4+3=10) 4. Total Slack Time of the Line = 10 5. Is this Line Balanced ? Yes, almost!
Image of page 49

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
Why line need be balanced (II)
Image of page 50
Image of page 51
This is the end of the preview. Sign up to access the rest of the document.

{[ snackBarMessage ]}

What students are saying

  • Left Quote Icon

    As a current student on this bumpy collegiate pathway, I stumbled upon Course Hero, where I can find study resources for nearly all my courses, get online help from tutors 24/7, and even share my old projects, papers, and lecture notes with other students.

    Student Picture

    Kiran Temple University Fox School of Business ‘17, Course Hero Intern

  • Left Quote Icon

    I cannot even describe how much Course Hero helped me this summer. It’s truly become something I can always rely on and help me. In the end, I was not only able to survive summer classes, but I was able to thrive thanks to Course Hero.

    Student Picture

    Dana University of Pennsylvania ‘17, Course Hero Intern

  • Left Quote Icon

    The ability to access any university’s resources through Course Hero proved invaluable in my case. I was behind on Tulane coursework and actually used UCLA’s materials to help me move forward and get everything together on time.

    Student Picture

    Jill Tulane University ‘16, Course Hero Intern