When configuring the Nexus switches for FCoE connectivity which two actions are

When configuring the nexus switches for fcoe

This preview shows page 2 - 5 out of 7 pages.

traffic across VSAN 11. When configuring the Nexus switches for FCoE connectivity, which two actions are required? (Choose two.)A. Create a new virtual FC interface and bind the physical
Background image
interface to it.B. Add the virtual interface to the VSAN.C. Create a port channel and add all of the physical D. Add the adapter MAC address to the network port Answer: B, Cnetwork ports that will have FCoE LIFs.configuration where the node is connected.4.Which tool collects configuration data from hosts and switches to assist in evaluating a qualified configuration?5.Your server administrator upgraded a Windows 2016 Server from 16 Gb to 32 Gb HBAs. The application owner is now reporting slower performance to the AFF A700.Which two actions will help troubleshoot performance on the server? (Choose two.)
Background image
Matrix Tool.
Background image
Image of page 5

You've reached the end of your free preview.

Want to read all 7 pages?

  • Spring '18
  • Trainer
  • administrator, Host adapter, Fibre Channel, ISCSI, Hosts file, NetApp, Ns0-509 Exam, NS0-509

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture