Total connected load in watts 621 300ma rcbo 10a 2p 2

Info icon This preview shows page 2. Sign up to view the full content.

View Full Document Right Arrow Icon
TOTAL CONNECTED LOAD (IN WATTS) - - 62.1 300mA RCBO 10A, 2P 2 Y1 (Y-PH) - 476.4 - 3 B1 (B-PH) 100.4 - - Cu/PVC SPARE - - - TOTAL CONNECTED LOAD (IN WATTS) INCLUDING 25% SPARE 799 - - 8 Nos. OF 57W LED LIGHT AT SWITCHGEAR ROOM Cu/PVC B3 300mA RCBO 2P 10A CKT No. CABLE CORE/SIZE (mm²) SL.No. CABLE TYPE BREAKER RATING LOAD DESCRIPTION (PHASE) 3Rx1Cx2.5 3Rx1Cx2.5 4 R2 (Y-PH) 1 No. OF 38.3W LED LIGHT AT BATTERY ROOM & 1 No. OF 57W LED LIGHT AT STORE / TESTING ROOM 8 - - - - - B3 (B-PH) SPARE 3 R2 (R-PH) 8 Nos. OF 57W LED LIGHT AT SWITCHGEAR ROOM 3Rx1Cx2.5 - - 456 Cu/PVC 1 No. OF 5.1W EXIT LED LIGHT AT HVAC ROOM SPARE - - - - - 5 Y2 (Y-PH) 0 0 8 Nos. OF 57W LED LIGHT AT SWITCHGEAR ROOM 3 Nos. OF 5.1W EXIT LED AT SWITCHGEAR ROOM 1 No. OF 5.1W EXIT LED AT STORE / TESTING ROOM OS * 1 No. OF 5.1W EXIT LED AT BATTERY ROOM 3P 32A 2P 16A 300mA RCBO 10A, 2P 300mA RCBO 10A, 2P 300mA RCBO 10A, 2P 300mA RCBO 10A, 2P 300mA RCBO 10A, 2P 300mA RCBO 10A, 2P 300mA RCBO 10A, 2P 300mA RCBO 10A, 2P 300mA RCBO 10A, 2P 300mA RCBO 10A, 2P 300mA RCBO 10A, 2P 300mA RCBO 10A, 2P MCB MCB 440V, 3PH+N, 4W, 32A, 50Hz, 14kA/1Sec. A1 DRAWING NUMBER PROJ. No. SCALE CHECKED DATE CHECKED APPROVED DRAWN DEBOTTLENECKING OF GC-17 CONTROL ROOM EXTEN.(17-LDB-018, 17-ELDB-019) SINGLE LINE DIAGRAM FOR INDOOR LIGHTING DB GC-17 (WEST KUWAIT) KOC DRG. No. REV. - CONTRACTOR DRG. No. - 0 REV. SHEET 01 OF 02 DATE SIGNATURE NAME DESIGNATION - GROUP / TEAM KOC APPROVALS CONTRACTOR REVISION M.MANIKANDAN 18.07.2016 NONE SHEET - OF - P.O.Box 46551, Fahaheel-64016, Kuwait. CONTRACT No. 15052358 PROJECT TITLE: DRAWING TITLE: R.P.SHANKAR/ N.KRISHNAN (GS) (KOC) (GS) (HEISCO) REV AMENDMENTS (KOC) APPRD. DATE CHECKED DRAWN (GS) (GS) A ISSUED FOR APPROVAL M.M RPS/NK 18.07.16 CHECKED (HEISCO) PMC DRG. No.52358-GC17-070-SLD-3207-001 NEW GC-17 S/S (17-LDB-011, 17-ELDB-012) & DATA SHEET FOR INDOOR LIGHTING DISTRIBUTION BOARD GC17-15052358-A-E-3115 NOTES: 3. ALL EQUIPMENT SHALL BE DESIGNED FOR SERVICE IN AN AMBIENT TEMPERATURE OF 4. FUTURE MOUNTING SPACE SHALL BE PROVIDED FOR MOUNTING ADDITIONAL 25%
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

{[ snackBarMessage ]}

What students are saying

  • Left Quote Icon

    As a current student on this bumpy collegiate pathway, I stumbled upon Course Hero, where I can find study resources for nearly all my courses, get online help from tutors 24/7, and even share my old projects, papers, and lecture notes with other students.

    Student Picture

    Kiran Temple University Fox School of Business ‘17, Course Hero Intern

  • Left Quote Icon

    I cannot even describe how much Course Hero helped me this summer. It’s truly become something I can always rely on and help me. In the end, I was not only able to survive summer classes, but I was able to thrive thanks to Course Hero.

    Student Picture

    Dana University of Pennsylvania ‘17, Course Hero Intern

  • Left Quote Icon

    The ability to access any university’s resources through Course Hero proved invaluable in my case. I was behind on Tulane coursework and actually used UCLA’s materials to help me move forward and get everything together on time.

    Student Picture

    Jill Tulane University ‘16, Course Hero Intern