In october 5000 meters of raw material were purchased

Info icon This preview shows pages 4–7. Sign up to view the full content.

View Full Document Right Arrow Icon
11. In October, 5,000 meters of raw material were purchased at an actual cost of $4.50 per meter. During October, 4,850 meters of the raw material were used to produce 2,400 units of the completed product. Standards call for 2 meters of the raw material for each unit of the completed product. The standard price of the raw material is $4.70 per meter. The materials variances for October were: A. Choice A B. Choice B C. Choice C D. Choice D Materials price variance = AQ (AP - SP) = 5,000 ($4.50 - $4.70) = $1,000 F SQ = 2 x 2,400 = 4,800 Materials quantity variance = SP (AQ - SQ) = $4.70 (4,850 - 4,800) = $235 U
Image of page 4

Info icon This preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
12. Discover Motor Company uses a standard cost system to collect costs related to the production of its toothpick motors. The direct labor standard for each toothpick motor is 1.25 hours at a standard cost of $9.50 per hour. During the month of May, Discover's toothpick motor production used 5,900 direct labor-hours at a total direct labor cost of $54,575. This resulted in production of 4,800 toothpick motors for May. What is Discover's labor efficiency variance for the month of May? SH = 1.25 x 4,800 = 6,000 Direct labor efficiency variance = SR (AH - SH) = $9.50 (5,900 - 6,000) = $950 F 13. The following labor standards have been established for a particular product: The following data pertain to operations concerning the product for the last month: What is the labor efficiency variance for the month? SH = 5.0 x 1,400 = 7,000 Direct labor efficiency variance = SR (AH - SH) = $19.85 (7,300 - 7,000) = $5,955 U
Image of page 5
Image of page 6

Info icon This preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
Image of page 7
This is the end of the preview. Sign up to access the rest of the document.

{[ snackBarMessage ]}

What students are saying

  • Left Quote Icon

    As a current student on this bumpy collegiate pathway, I stumbled upon Course Hero, where I can find study resources for nearly all my courses, get online help from tutors 24/7, and even share my old projects, papers, and lecture notes with other students.

    Student Picture

    Kiran Temple University Fox School of Business ‘17, Course Hero Intern

  • Left Quote Icon

    I cannot even describe how much Course Hero helped me this summer. It’s truly become something I can always rely on and help me. In the end, I was not only able to survive summer classes, but I was able to thrive thanks to Course Hero.

    Student Picture

    Dana University of Pennsylvania ‘17, Course Hero Intern

  • Left Quote Icon

    The ability to access any university’s resources through Course Hero proved invaluable in my case. I was behind on Tulane coursework and actually used UCLA’s materials to help me move forward and get everything together on time.

    Student Picture

    Jill Tulane University ‘16, Course Hero Intern