D. Assign them to the lead developers on the team. Answer: A
Question: 114 When is a Sprint over? D
Question: 115 Scrum has a role called "Project Manager". B
Question: 116 Where are two good ways for the Development Team to make non-functional requirements visible? (Choose two.)
Question: 117 How much time is required after a Sprint to prepare for the next Sprint? A. The break between Sprints is time-boxed to 1 week for 30 day Sprints, and usually less for shorter sprints. B. Enough time for the requirements for the next Sprint to be determined and documented.