Adjust outstanding changes review allowances not

This preview shows page 5 - 7 out of 7 pages.

adjust outstanding changes, review allowances not completely used, and discuss procedures for final billings a. mediation b. project closeout meeting c. postproject review d workshop session 29. The final act of the field management
team should be an) a staff meeting b. specialized meeting c.
the blank. Use the correct term to complete the statement. 30 are an effective way to record the content of meetings and to hold individuals accountable for their statements. 31. The construction project provide a matrix of organization, with formal and informal contractual relationships between participants 32. In building construction, much of the work isaccomplished by who have an agreement with the contractor to complete a specific portion of the work covered by the contractor's contract requirements 33. In the traditional system, subcontractors should not communicate directly with the architect but should approach the contractor's superintendent or
34. An agency CM system involving a number of contracts directly with the owner but managed by the contractor is usually called 35. In the design-build delivery model, communication is typically flows between the and the design-build firm's project manager of the project furnishes the construction documents to the contractor for 36. The the project 37. The section contains information about the bid procedure. is commonly used for most building construction specifications in the 38. The U.S. and Canada 39. 40. The drawings are usually identified by an "A" designation Size and physical characteristics should be reviewed by both the contractors and the 41. A) is a physical portion of the specified product. is a schedule of activities for particular products from submittal 42. The through delivery to the jobsite. 43. The is used for tracking the actual progress of thesubmittal. 44. A request for information, or RFI, is typically sent from contractor to the 45. The weekly or monthly report for internal management is normally written in form. 46. Material delivery to the jobsite, and even to the location within the jobsite, is most economically done by delivery people employed by the of material on the jobsite should be systematic 48. Because moving material on vertical lifts takes much more time, particularly in loading and unloading, it is best to separate transportation from material transportation and 100 49. Safety standards require that clean, tepid wash water between degrees be provided at the construction jobsite.
50. The can be an accurate account of telephone conversations, or it can be a list that contains the time of the call, the person called, and the person calling

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture