In which phase of the life cycle does the Life Cycle Sustainment Plan LCSP

In which phase of the life cycle does the life cycle

This preview shows page 2 - 4 out of 5 pages.

6) In which phase of the life cycle does the Life Cycle Sustainment Plan (LCSP) focus on development of sustainment metrics to influence design, the product support strategy, and on actions that can be taken prior to the next milestone to reduce future operating and support costs? 2.3 Pg14 EMD Phase P&D Phase O&S Phase TMRR Phase 7) The Joint Staff has oversight for certifying interoperability capability requirements for the Army, Navy, Air Force, and Marine Corps are valid. 8) The ____________________ provides military intelligence to defense policy makers, force planners and warfighters in DOD in support of weapons system acquisition. 9) The operational effectiveness and operational suitability questions that must be addressed during Operational Test and Evaluation (OT&E) to assess the system's capability to perform its mission are called ___________. 2.5-Pg 18 10) DoD policy is to consider international cooperative development only after U.S.-only solutions have been shown to be impractical.
Image of page 2
True False 11) The Test and Evaluation Master Plan (TEMP) is mandated by DoD policy and must be updated periodically to ensure that it stays current as the program evolves through the life cycle. 12) Which of the following is a duty of the Director, Operational Test and Evaluation (DOT&E)?
Image of page 3
Image of page 4

You've reached the end of your free preview.

Want to read all 5 pages?

  • Fall '16
  • operational test

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture