Unit marerial labour rate total 13278075 skirting

  • No School
  • AA 1
  • 60

This preview shows page 25 - 27 out of 60 pages.

Unit Marerial Labour Rate Total 132,780.75 Skirting Meranti or from cut floor tiles. 50.00 m 100.00 - 100.00 5,000.00 Decorations Painting Internal Only 215.47 m2 48.00 - 48.00 10,342.46 Decorations 'Shadowline' Cornice - Donn System 50.00 m 88.20 - 88.20 4,410.00 Kitchen BIC inclusive of runners, hinges, glides, bases and handels 1.00 No. 17,000.00 - 17,000.00 17,000.00 KitchenTops 30mm x 600 laminated Island Granite Honed Work Surface 1.00 No. 8,662.28 - 8,662.28 8,662.28 Kitchen Sink - Franke ss Double Bowl Sink Unit 1.00 No. 1,393.86 - 1,393.86 1,393.86 Kitchen Stove and Hob icluding installation 1.00 No. 3,333.33 - 3,333.33 3,333.33 Kitchen Taps and Fittings 1.00 No. 955.26 - 955.26 955.26 Floor Tiling Internal - 600 x 600 Porceline Tile 82.00 m2 129.82 - 129.82 10,645.61 Patio Tiling 9.00 m2 100.00 - 100.00 900.00 Matted 100 x 100 Mosaic 2.00 No. 341.23 - 341.23 682.46 Tiling Adhesive 40.95 Bags 65.79 - 65.79 2,694.08 Talpro Grout 2.00 No. 65.79 - 65.79 131.58 Bathroom Vanity - Cascade vanity swing door units 2.00 No. 864.91 - 864.91 1,729.82 Bathroom Vanity Tops - 600 x 600 x 20 mm Profiled Brushed Marble Vanity Tops 2.00 No. 613.16 - 613.16 1,226.32 Bathroom Taps - Square Basin Mixer incl bath taps 3.00 No. 1,121.93 - 1,121.93 3,365.79 Wash Hand Basin - Kansas Counter Top Basin including required traps 2.00 No. 876.32 - 876.32 1,752.63 Guest Toilet WHB including required traps - No. 650.00 - 650.00 - Basin Clicker Waste 3.00 No. 69.30 - 69.30 207.89 Bath 1.00 No. 1,500.00 - 1,500.00 1,500.00 Shower enclosures 1.00 No. 1,200.00 - 1,200.00 1,200.00 Ultra Square Shower Head 2.00 No. 1,121.93 - 1,121.93 2,243.86 Ultra Shower Arm 2.00 No. 507.89 - 507.89 1,015.79 Square Concealed Shower Mixer 2.00 No. 858.77 - 858.77 1,717.54 Square Shower Trap 2.00 No. 244.74 - 244.74 489.47 Toilets - Bermuda Close Couple 2.00 No. 1,490.35 - 1,490.35 2,980.70 Bathroom Accessories - Allowance 2.00 No. 350.00 - 350.00 700.00 Bathroom Mirrors 2.00 No. 500.00 - 500.00 1,000.00 BIC in Bedrooms - 3 Component 600W x 2100H BIC Cascade Laminated 3.00 No. 5,000.00 - 5,000.00 15,000.00 Heat Pump - No. - - - - Geyser - Solar 1.00 No. 15,000.00 - 15,000.00 15,000.00 Jo Jo Tank 1.00 No. 4,000.00 - 4,000.00 4,000.00 Prepaid water meter 1.00 No. 1,500.00 - 1,500.00 1,500.00 Installation 1.00 Item - 10,000.00 10,000.00 10,000.00 Attendance 1.00 0.00% - - - - Profit 5% - 0.00% - - - - 7b. SINGLE PHASE ELECTRICAL WORK including all cabling and wiring Quantity Unit Marerial Labour Provisional sum 42,000.00 45,250.00 Main Cable connection 20.00 m - - DB Board 1.00 No. - - Light Unit 9.00 No. - - Light Fittings 9.00 No. - - Plug Unit 8.00 No. - - Data Unit 1.00 No. - - Switch Unit 9.00 No. - - Prepaid Electricity Meter 1.00 No. 1,500.00 1,500.00 1,500.00 Installation 1.00 5.00% 1,750.00 1,750.00 1,750.00 Attendance - 5.00% - - Profit 5% - 0.00% - - 8 WINDOWS AND DOORS Quantity Unit Marerial Labour Provisional sum 40,000.00 51,425.00 Aluminium Windows External powder coated aluminium window frames and assoc 1.2 x 6QTY8 0.6 x 1.8QTY4 0.9 x 1.8QTY4 0.9 x 0.6QTY4 Doors Internal hollow core doors including frames 4 No. 1,650.00 6,600.00 External solid core door - Front Door including frames 1 No. 2,275.00 2,275.00 Main bathroom toilet enclosure 1 No. 1,500.00 1,500.00 Ironmongery Two lever lockset complete with handles 4 No. 200.00 800 Three lever lockset complete with handles 1 No. 250.00 250 Attendance - 0.00% - - Profit 5% - 0.00% - - 91 9 Allowance for Landscaping to Exterior of unit 1 Item 5,000.00 5,000.00 5,000.00 per m2 10 Carport 1 Item 7,500.00 7,500.00 7,500.00 SUB TOTAL BUILDING WORK 584,199.06 6,419.77 P&G 7.50% 43,814.93 481.48 BUILDERS PROFIT 10.00% 58,419.91 641.98 SUB TOTAL COST FOR UNIT 686,433.90 7,543.23 DISCOUNT 2.00% 13,728.68 150.86 DISCOUNTED TOTAL 672,705.22 7,392.37 BUDGET 766,883.95 8,427.30 VAT incl 14.00% 766,883.95 8,427.30 UNDER/OVERSPEND 0.00 0.00
Image of page 25
EZULWINI ECO ESTATE A DEVELOPMENTBY MERELAVA 26 | P a g e Professional Team Ezulwini Lifestyle Village Project Team List - TWIGGS 3-Dec-16 Name Proffession/Trade Company Contact Number email Fee Quotes Steve Hall Architect/Principle Agent Steve Hall (+268) 7602 1210 [email protected] Anthoy Mcguire Property Agent Seeff (+268) 782 76861 [email protected] Judy Currie Legal Services Matthew Farrell Civil/Structural Engineers
Image of page 26
Image of page 27

You've reached the end of your free preview.

Want to read all 60 pages?

  • Fall '19
  • Bathroom, Shower, Incl, EZULWINI ECO ESTATE

What students are saying

  • Left Quote Icon

    As a current student on this bumpy collegiate pathway, I stumbled upon Course Hero, where I can find study resources for nearly all my courses, get online help from tutors 24/7, and even share my old projects, papers, and lecture notes with other students.

    Student Picture

    Kiran Temple University Fox School of Business ‘17, Course Hero Intern

  • Left Quote Icon

    I cannot even describe how much Course Hero helped me this summer. It’s truly become something I can always rely on and help me. In the end, I was not only able to survive summer classes, but I was able to thrive thanks to Course Hero.

    Student Picture

    Dana University of Pennsylvania ‘17, Course Hero Intern

  • Left Quote Icon

    The ability to access any university’s resources through Course Hero proved invaluable in my case. I was behind on Tulane coursework and actually used UCLA’s materials to help me move forward and get everything together on time.

    Student Picture

    Jill Tulane University ‘16, Course Hero Intern

Stuck? We have tutors online 24/7 who can help you get unstuck.
A+ icon
Ask Expert Tutors You can ask You can ask ( soon) You can ask (will expire )
Answers in as fast as 15 minutes
A+ icon
Ask Expert Tutors