the required parts are arranged by Smart Arcade. And finally product will be checked and
delivered to the customer.
Smart Arcade one use a paper based system to store information
their customer orders & then does arrangements.
Outline of the project
The main outline is this project reduces paper based system. The prototype Model has been
selected as the Software lifecycle model to develop the new system The new system will
reduce paper works and it will help the employee to save their time and more productive
Method of Analysis.
Analyst should be defining how the methods & analysis for conducting use for feasibility
study.
Ayesha Silva
Systems Analysis and Design
Page | 38

Technology Feasibility
Technology feasibility is a kind of practical measurement of particular technical resources. It
means the understanding of an accessibility of technological & skills. There proposed system
met customer needs & business has enough recourses to run the new system. In term of
software, hardware, personal & expected to handle the new system.
All the technological features of the current system will be studied and will be included in the
proposed system.
There are backup plans for the proposed system. There have high security & privacy.
All the features of the current system will be included. In the new system. The
proposed system must have the same privacy rules of the current system.
Economic Feasibility
Economic is deciding total cost of the whole product. In order words calculating expenses &
determining the project budget. Development team will have to spend money to developing
tools, employees, hardware, software tools & etc. After analyzed the requirements cost can
estimate. Developers will have to give a value for the system. There are some important
things in economic criteria. There are some important things in economic criteria.
An estimated cost of the product can fulfill user requirement.
Estimated cost is enough to finish the project.
Cost calculation to implement the system.
Details benefits analyst
Quantity
Personnel
Estimated Cost
3
System analysts 110 hours
Rs. 1200 per hour
4
Software developers 30 hours
Rs. 1000 per hour
1
System architects 30 hours
@
Rs. 1500 per hour
Total
Rs. 3700 per hours
Ayesha Silva
Systems Analysis and Design
Page | 39
Table 2 - Cost calculation to implement the system
Source (Author designed)

Cost calculation for developing system.
Technical Requirements
Quantity
Hardware
Cost
1
Desktop computer Machine
(IS, 3
rd
generation processor, 1GB VGA,
1GB RAM, 1TB hard disk, wide screen
Monitor, Keyboard, Mouse
Rs.60,000
1
Lesser jet printers (HP Printers)
Rs. 3000
Quantity
Software
Cost
1
Windows 8.1 (legal 100y)
Rs. 12,200
Operational Feasibility
This mainly refers to the studying the aspect of the operational of the current system. The
designer checks whether the proposed systems provide all the functions in the current system
& have to confirm these functional are available for the new system. The company has
employee but lack of technological skills. So analysis must train the employee to the
computerize system. So analysis has to gather following details before the system
development.
Do they support for the proposed system?

