And finally product will be checked and delivered to the customer Smart Arcade

And finally product will be checked and delivered to

This preview shows page 38 - 41 out of 58 pages.

the required parts are arranged by Smart Arcade. And finally product will be checked and delivered to the customer. Smart Arcade one use a paper based system to store information their customer orders & then does arrangements. Outline of the project The main outline is this project reduces paper based system. The prototype Model has been selected as the Software lifecycle model to develop the new system The new system will reduce paper works and it will help the employee to save their time and more productive Method of Analysis. Analyst should be defining how the methods & analysis for conducting use for feasibility study. Ayesha Silva Systems Analysis and Design Page | 38
Image of page 38
Technology Feasibility Technology feasibility is a kind of practical measurement of particular technical resources. It means the understanding of an accessibility of technological & skills. There proposed system met customer needs & business has enough recourses to run the new system. In term of software, hardware, personal & expected to handle the new system. All the technological features of the current system will be studied and will be included in the proposed system. There are backup plans for the proposed system. There have high security & privacy. All the features of the current system will be included. In the new system. The proposed system must have the same privacy rules of the current system. Economic Feasibility Economic is deciding total cost of the whole product. In order words calculating expenses & determining the project budget. Development team will have to spend money to developing tools, employees, hardware, software tools & etc. After analyzed the requirements cost can estimate. Developers will have to give a value for the system. There are some important things in economic criteria. There are some important things in economic criteria. An estimated cost of the product can fulfill user requirement. Estimated cost is enough to finish the project. Cost calculation to implement the system. Details benefits analyst Quantity Personnel Estimated Cost 3 System analysts 110 hours Rs. 1200 per hour 4 Software developers 30 hours Rs. 1000 per hour 1 System architects 30 hours @ Rs. 1500 per hour Total Rs. 3700 per hours Ayesha Silva Systems Analysis and Design Page | 39 Table 2 - Cost calculation to implement the system Source (Author designed)
Image of page 39
Cost calculation for developing system. Technical Requirements Quantity Hardware Cost 1 Desktop computer Machine (IS, 3 rd generation processor, 1GB VGA, 1GB RAM, 1TB hard disk, wide screen Monitor, Keyboard, Mouse Rs.60,000 1 Lesser jet printers (HP Printers) Rs. 3000 Quantity Software Cost 1 Windows 8.1 (legal 100y) Rs. 12,200 Operational Feasibility This mainly refers to the studying the aspect of the operational of the current system. The designer checks whether the proposed systems provide all the functions in the current system & have to confirm these functional are available for the new system. The company has employee but lack of technological skills. So analysis must train the employee to the computerize system. So analysis has to gather following details before the system development. Do they support for the proposed system?
Image of page 40
Image of page 41

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture