Wickersley bramley doncaster iport approx 65 min rail

This preview shows page 28 - 33 out of 44 pages.

Wickersley, Bramley, Doncaster iPort, approx. 65 min.)RailDoncaster railway station (11 km from DSA) on the East Coast Main Line(from London to Edinburgh)Unsuccessful plans to open a new station at Finnigley
Viability in Developing Future AirTransport Services
Viability in Developing Future Air TransportServicesD O N C A S T E R / S H E F F I E L D ( D S A )Doncaster is the UK’s fastest growing airport outside ofLondon.The draft airport master plan highlights that DSA representsone of the few airports in the UK that has the capacity toenable large-scale air cargo growth without impacting theability to deliver substantial passenger growth.Regarding future air transport services working successfullygiven DSA’s unique position and attributes.The vision is for it to grow substantially into a major transporthub for passengers and freight for catchments east of thePennines, north of London and up to the north east of EnglandE A S T M I D L A N D S / N O T T I N G H A M ( E M A )Unlike many transport hubs largely affiliated withcities, East Midlands Airport is at the very centre ofthe region, linking Nottingham, Derby andLeicester.Passenger numbers peaked in 2008 at just under sixmillion, with the list of destinations includingAmsterdam Schiphol, Paris, Frankfurt and Brussels.Long-haul connectivity is also an ambition. Theregion has important connections into the Indiansubcontinent, which is a key focus for this airport.
Viability in Developing Future AirTransport Services (NCL)The higher growth forecast we have used indicates growth in passengernumbers of up to:-7.6m by 20258.7m by 20309.4m by 2035The forecast assumes growth will be driven by an expansion of ourdomestic, European, and transcontinental route network, as well as someupsizing of aircraft on existingIt is anticipated that by 2025 there will be up to approximately 75,200movements, up to 80,800 in 2030 and by 2035 up to 83,300.The 2035 total would be an increase of up to 40% over the 59,407handled in 2017, but would only be slightly greater than the number ofmovements in the year 2000.Source: (Newcastle International Master Plan, 2019)
Viability in Developing Future AirTransport Services (NCL) ContinuationThe catchment area for the airport overlaps with other airports so there is the potential to capture some of thesepassengers with increased airlines and destinations.There are a number of ongoing national and regional transport infrastructure projects which will enhance surfacetransport from surrounding areas. For example, Transport for the North has set out its investment ambitions spanningover 30 years which it says would transform the region. The Northern Infrastructure Pipeline is made up of £5bnworth of spending on roads, rail and other transport measures designed to boost growth and create 20,000 jobs.

Upload your study docs or become a

Course Hero member to access this document

Upload your study docs or become a

Course Hero member to access this document

End of preview. Want to read all 44 pages?

Upload your study docs or become a

Course Hero member to access this document

Term
Fall
Professor
N/A
Tags
Test, Thomson Airways, Doncaster, East Midlands Airport, Airports in England, Thomsonfly, Newcastle International Airport

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture