A Life Cycle Cost Estimate LCCE encompasses past present and future costs for

A life cycle cost estimate lcce encompasses past

This preview shows page 4 - 5 out of 5 pages.

15) A Life-Cycle Cost Estimate (LCCE) encompasses past, present, and future costs for every aspect of the program, regardless of funding source. [Identify how the program Life Cycle Cost Estimate (LCCE) is incorporated, by appropriation, into a properly-phased budget plan that extends the duration of the program.] FalseTrue 16) Which of the following is a benefit of the implementation of "affordability" into the DoD Decision Support System? [Identify the role "affordability" plays across the DoD Decision Support Systems.] 17) Components whose acquisitions all have planned life cycles of and reach steady-state in 15 years may have affordability analysis that cover: [Identify the parameters of affordability analysis.] 18) Which of the following is a way that Total Ownership Costs (TOC) differs from Life Cycle Costs (LCC)? [Differentiate between Life Cycle Costs (LCC) and Total Ownership Costs (TOC).] 19) An engineering improvement that increases the mean time between failure (MTBF) thus decreasing operating support costs is an example of: [Identify the difference between cost savings and cost avoidance in regard to Total Ownership Costs (TOC).] Cost avoidanceCost savingsWill costShould cost 20) Which cost analysis begins with a bottoms-up assessment of what programs should cost if reasonable efficiency and productivity are applied? [Recognize the difference between "Should Cost" and "Will Cost."]"Should Cost"11/15/2018 Page 4 of 5 DAU
Image of page 4
"Could Cost" "Total Cost" "Fixed Costs" Back to Status page Page 5 of 5 DAU 11/15/2018
Image of page 5

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture