127.Lorraine identified the source for the fabrication-related activities required for hisproject integration. Lorraine selected the bidder with the most credibility,qualifications, experience, and expertise. What is the selection method Lorraine isadopting?a.Qualification onlyb.Least costc.Sole sourced.Fixed budget
128.Roger is planning to use Design of Experiments (DOE) as part of the planning activityunder the quality framework to determine which factors might influence specificvariables. Which variable can be used in Rogers analysis?
129.Marco is defining the method for identifying the projects requirements. He noticescritical services may be acquired outside of the project to meet the organizationsneeds. This is done as part of which process?
130.Martin is the project manager responsible for developing a new type of soap withcow dung. Martin decided to do statistical sampling for this project. Statisticalsampling surveys only a portion of the population of interest. If Martin had chosento survey the entire population, which of the following is NOT a problem, you wouldencounter?
131.Joseph collaborated with his team to determine the duration of his projectactivities. He was referring to the fact that, since no proper historical data wasavailable, he went for a triangular distribution technique to arrive at the durationestimates. Which estimation technique was Joseph referring to?a.Three-point estimatesb.Parametric estimatesc.Analogous estimatesd.Bottom-up estimates
132.Which of the following expertise should be considered for providing expertjudgment for developing project charter?

Upload your study docs or become a

Course Hero member to access this document

Upload your study docs or become a

Course Hero member to access this document

End of preview. Want to read all 56 pages?

Upload your study docs or become a

Course Hero member to access this document

Term
Fall
Professor
NoProfessor
Tags
Project Management, project manager

Newly uploaded documents

Show More

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture