Cost of operating Labour C OL Cost of utilities C UT Cost of Waste treatment C

Cost of operating labour c ol cost of utilities c ut

This preview shows page 6 - 13 out of 20 pages.

Cost of operating Labour (C OL ) Cost of utilities (C UT ) Cost of Waste treatment (C WT ) Cost of raw materials (C RM ) COM = 0.280 FCI + 2.73 C OL + 1.23 ( C UT + C WT + C RM )------(8.1) with depreciation as 10% FCI COM d = 0.180 FCI + 2.73 C OL + 1.23 ( C UT + C WT + C RM ).----(8.2) COM without depreciation
Image of page 6

Subscribe to view the full document.

Image of page 7