requirements test planning and test execution activities in support of a

Requirements test planning and test execution

This preview shows page 12 - 15 out of 20 pages.

requirements, test planning, and test execution activities in support of a program’s acquisition strategy.]FalseTrue 15) Which of the following is a true statement about the Product Support Strategy Process Model?[Identify long term supportability and sustainment strategies through the application of the Product Support Business Model (PSBM).][Remediation Accessed :N] It is an iterative process in which the sustainment of a system (or systems) is adapted and It is a one-time process that defines the needs and requirements of the Warfighter early in the It enables the identification of supportability and sustainment strategies near the end of the evolved to optimally support the needs and requirements of the Warfighter.life cycle.life.
Background image
It is a continuing process that assists in the identification and evolution of the PSM IPT. 16) At which point in the life cycle does the Life Cycle Sustainment Plan (LCSP) focus on development of sustainment metrics to influence design, the product support strategy, and on actions that can be taken prior to the next milestone to reduce future operating and support costs? [Capture the Product Support Strategy and specific planning and execution details in the Life Cycle Sustainment Plan (LCSP).] 17) The Joint Staff has oversight for certifying interoperability capability requirements for the Army,Navy, Air Force, and Marine Corps are valid. [32d. Identify the requirements for interoperability testing.][Remediation Accessed :N] 18) The final approval authority for system-related National Environmental Policy Act (NEPA) documentation is the: [3a (2). Identify the information required for a milestone review regarding environmental, safety, and occupational health issues.] 1) The Test and Evaluation Master Plan (TEMP) links together, and must be consistent with, which of the following related program documents (Select all that apply)? [21a. Recognize how the Test and Evaluation Master Plan (TEMP) generation, staffing and approval process integrates all functional disciplines throughout the acquisition life cycle.]
Background image
Systems Threat Assessment Initial Capabilities Document Systems Engineering Management Plan Acquisition Program Baseline (STA)(ICD)(SEMP)(APB)
Background image
Image of page 15

You've reached the end of your free preview.

Want to read all 20 pages?

  • Fall '16
  • Integrated Product, Acquisition Program Baseline, operational test, process development

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture