2 the test evaluation master plan temp assesses both

This preview shows page 1 - 3 out of 3 pages.

2) The Test & Evaluation Master Plan (TEMP) assesses both capstone verification (e.g.,Developmental Testing) and validation (e.g., various types of Operational Testing).[Explain therelationship of a TEMP to the Verification Plan]TrueFalse
3) Methods used for verification of DoD systems include: Analysis, Inspection, Test and:[Describe four methods used for verification.]
ValidationModeling4) "Evaluation" is a procedure or process used to obtain data while "Test" is the analysisand assessment of data.[Explain the differences between Test and Evaluation]
5) Modeling and Simulation (M&S) can be used as part of the Verification Process to: Selectthe two correct answers.[Describe the role of Modeling and Simulation (M&S) in verification]
6) A Verification Matrix can be used for: Select the three correct answers.[Describe how aVerification Matrix is used]Addressing Architecture Design Process deficienciesCorrective actions takenDocumenting changes made to the production baselineForm of the end product usedShowing bi-directional traceability among requirements
7) One of the sources of verification deficiencies can be:[Identify sources of verificationdeficiencies]
Over-stressing the system by operating it in its intended environmentExcessive time spent in the Validation ProcessPremature transition of the End Product to the user
End of preview. Want to read all 3 pages?

Upload your study docs or become a

Course Hero member to access this document

Term
Fall
Professor
N/A
Tags
Formal verification, Verification, Verification and validation, Validation, Modeling and Simulation

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture