63 d 800 fixed moh 373000 360000 e fixed moh per hour

This preview shows page 20 - 22 out of 71 pages.

We have textbook solutions for you!
The document you are viewing contains questions related to this textbook.
Accounting
The document you are viewing contains questions related to this textbook.
Chapter 23 / Exercise 23-3
Accounting
Reeve/Warren
Expert Verified
$8.63d$8.00Fixed MOH$373,000$360,000eFixed MOH per hour$13.13fa 4,400 units × 6.00 machine-hours/unit = 26,400 machine-hoursb 28,400 ÷ 4,400 = 6.45 machine-hours per unitc4,400 units × 6.00 machine-hours per unit × $8.00 per machine-hour = $211,200d$245,000 ÷ 28,400 = $8.63e4,000 units × 6.00 machine-hours per unit × $15 per machine-hour = $360,000f$373,000 ÷ 28,400 = $13.132.Variable Manufacturing Overhead Control245,000Accounts Payable Control and other accounts245,000Work-in-Process Control211,200Variable Manufacturing Overhead Allocated211,200Variable Manufacturing Overhead Allocated211,200Variable Manufacturing Overhead Spending Variance17,800Variable Manufacturing Overhead Efficiency Variance16,000Variable Manufacturing Overhead Control245,000Fixed Manufacturing Overhead Control373,000Wages Payable Control, Accumulated Depreciation Control, etc. 373,000Work-in-Process Control396,000Fixed Manufacturing Overhead Allocated396,000Fixed Manufacturing Overhead Allocated396,000Fixed Manufacturing Overhead Spending Variance13,000Fixed Manufacturing Overhead Production-Volume Variance36,000Fixed Manufacturing Overhead Control373,0003.Individual fixed manufacturing overhead items are not usually affected very much byday-to-day control. Instead, they are controlled periodically through planning decisions andbudgeting procedures that may sometimes have horizons covering six months or a year (forexample, management salaries) and sometimes covering many years (for example, long-termleases and depreciation on plant and equipment).4. The fixed overhead spending variance is caused by the actual realization of fixed costsdiffering from the budgeted amounts. Some fixed costs are known because they arecontractually specified, such as rent or insurance, although if the rental or insurance contractexpires during the year, the fixed amount can change. Other fixed costs are estimated, such as8-0
We have textbook solutions for you!
The document you are viewing contains questions related to this textbook.
Accounting
The document you are viewing contains questions related to this textbook.
Chapter 23 / Exercise 23-3
Accounting
Reeve/Warren
Expert Verified
the cost of managerial salaries which may depend on bonuses and other payments not known atthe beginning of the period. In this example, the spending variance is unfavorable, so actualFOH is greater than the budgeted amount of FOH. The fixed overhead production volume variance is caused by production being over orunder expected capacity. You may be under capacity when demand drops from expected levels,or if there are problems with production. Over capacity is usually driven by favorable demandshocks or a desire to increase inventories. The fact that there is a favorable volume varianceindicates that production exceeded the expected level of output (4,400 units actual relative to adenominator level of 4,000 output units).
SOLUTION EXHIBIT 8-27Actual Costs Incurred(1)Actual Input× Budgeted Rate(2)Flexible Budget: Budgeted Input Allowed for Actual Output × Budgeted Rate(3)Allocated:Budgeted InputAllowed forActual Output×Budgeted Rate(4)VariableMOH$245,000(28,400 × $8)$227,200(4,400 × 6 × $8)$211,200(4,400 × 6 × $8)$211,200Actual CostsIncurred(1)Same BudgetedLump Sum(as in Static Budget)Regardless ofOutput Level(2)Flexible Budget:Same Budgeted Lump Sum (as in Static Budget)Regardless ofOutput Level(3)Allocated:Budgeted InputAllowed for Actual Output × Budgeted Rate(4)FixedMOH$373,000(4,000 × 6 × $15)$360,000