Generation Projects in Odisha and Immediate Evacuation System for Odisha Power Generation Corporation Limited OPGC (1,320 MW) Project in Odisha. The last date for submission of bids was December 15, 2015. PFC Consulting Limited is conducting the auction of the project. The project involves the construction of the 350 km long, 765 kV Jharsuguda (Sundargarh)–Raipur Pool double-circuit transmission line and the 50 km long, 400 kV OPGC– Jharsuguda (Sundargarh) double-circuit transmission line. Laos’ EDL commissions 230 kV northern grid project Lao People’s Democratic Republic’s (Laos) state-owned power company Electricite du Laos (EDL) has put its 230 kV Northern Laos Power Grid Project into operation on November 29, 2015. The project will help improve the power grid structure in northern Laos, improve power supply quality and reliability of the existing grid, and
Image of page 18
Global Transmission Report | January 2016 19 News strengthen the power grid structure of Laos. Under the project, five 230 kV lines will be constructed in the country’s northern region to evacuate power from the Nam Ou cascade power plants. The project also entails the construction of two new 230 kV substations (Beimeng and Namo) and one 230 kV switching station (Bendai), and expansion of the existing 230 kV Luang Prabang 2 substation. The construction work on the project was taken up by Yunnan International Company, a subsidiary of China Southern Power Grid, and is one of the China-Laos cooperation projects within the belt and road initiative proposed by China to enhance regional connectivity. The Belt and Road initiative routes run through continents of Asia, Europe and Africa, connecting the vibrant East Asia economic circle at one end and developed European economic circle at the other. Vietnam’s NPT energises 110 kV line State-owned Electricity of Vietnam’s (EVN) transmission subsidiary National Power Transmission Corporation (EVN NPT) has energised the 110 kV Hai Duong 2–Hoa Phat transmission line project on December 9, 2015. The project involves the construction of a 110 kV line from the 220 kV Hai Duong 2 substation to the 110 kV Hoa Phat substation at an estimated cost of VND33 billion. This line has been built with the goal of providing a second power source for the Hoa Phat substation, ensuring stable power supply, reduction in power losses, improving safety, and ensuring overall development of regional electricity grids, in particular Kinh Mon district, Hai Duong province and the region in general. (VND1=USD 0.00004) Vietnam commissions 220 kV line project On December 8, 2015, Power Company Number 3, under the state power company EVN, has commissioned the 220 kV An Khe–Quy Nhon circuit 2 transmission line. This marks the completion of the 220 kV An Khe–Quy Nhon transmission line, circuit 2 combined improving circuit 1 project.
Image of page 19
Image of page 20

You've reached the end of your free preview.

Want to read all 62 pages?

  • Fall '10
  • BOB
  • Electric power transmission, Electricity distribution, Electricity market, CFE, Federal Energy Regulatory Commission

What students are saying

  • Left Quote Icon

    As a current student on this bumpy collegiate pathway, I stumbled upon Course Hero, where I can find study resources for nearly all my courses, get online help from tutors 24/7, and even share my old projects, papers, and lecture notes with other students.

    Student Picture

    Kiran Temple University Fox School of Business ‘17, Course Hero Intern

  • Left Quote Icon

    I cannot even describe how much Course Hero helped me this summer. It’s truly become something I can always rely on and help me. In the end, I was not only able to survive summer classes, but I was able to thrive thanks to Course Hero.

    Student Picture

    Dana University of Pennsylvania ‘17, Course Hero Intern

  • Left Quote Icon

    The ability to access any university’s resources through Course Hero proved invaluable in my case. I was behind on Tulane coursework and actually used UCLA’s materials to help me move forward and get everything together on time.

    Student Picture

    Jill Tulane University ‘16, Course Hero Intern

Stuck? We have tutors online 24/7 who can help you get unstuck.
A+ icon
Ask Expert Tutors You can ask You can ask You can ask (will expire )
Answers in as fast as 15 minutes