Jigs – a fixture that holds the part during assembly process. Draft angle – a give way of angle for easy release of a plastic product from the mould. Also, to eliminate drag mark. Aesthetics – a shape of a product that can attracts customer. 10
Image of page 11
CHAPTER 2 PRODUCT COST ESTIMATION 2.1 MATERIAL COST The selected material for the plastic parts is ABS. The price for ABS material in the market is EURO 0.52/kg ; acquired from the Plasticker website as in figure 1 . The conversion of EURO to Malaysian Ringgit: 1 EURO = RM 4.55 Therefore, 0.52 EURO = RM 2.366 Hence the price for the ABS material is RM 2.37/kg Figure 1 11
Image of page 12
12
Image of page 13
2.2 WAGE RANGE OF WORKERS IN MALAYSIA (MANUFACTURING) The source from , the average salary for Production Operator is RM 1372.00 as in figure 2. FIGURE 2 2.3 THE RATE OF MACHINE TONNAGE Referring to the selected website - analysis.html .The selected company from the website is ACOMOLD (Mould & Moulding Solution) and the rate of the machine tonnage and the cost selected are as below : 80 Tonne =Yuan 45/hour= RM 26.55 100 Tonne =Yuan 60/hour= RM 35.40 120 Tonne =Yuan 85/hour= RM 50.15 150 Tonne =Yuan 110/hour= RM 64.90 180 Tonne =Yuan 140/hour=RM 82.60 Note that 1 Yuan = 0.59 Malaysian Ringgit 13
Image of page 14
2.4 MOULDING PART COST ESTIMATION 2.4.1 FRONT PANEL Table 1: Front Panel moulding cost estimation. DESCRIPTIO N PART NAME FRONT COVER PART NO. 300-0001-00 MATERIAL TYPE ABS MATERIAL COLOUR SMOOTH ASH PRICE/KG (RM) 2.37 RAW NO. OF CAVITY 1 MATERIAL PART WEIGHT (GM) 50.00 RUNNER WEIGHT (GM) 5.00 SHOT WEIGHT (GM) 55.00 MATERIAL YIELD RATE (%) 10.00 MATERIAL WASTAGE (%) 20.00 MATERIAL COST (RM/PC) 0.1695 MACHINE TONNAGE 150 MACHINE RATE (RM/HR) 64.90 MOULDING MACHINE INEFFICIENCY (%) 5.00 CYCLE TIME (SECS) 50.00 PRODUCTION OUTPUT (PCS/HR) 72 MOULDING COST (RM/PC) 0.9465 SUB-TOTAL COST (RM/PC) 1.1159 SECONDARY TAMPO PRINT (RM/PC) 0.0000 PROCESS Spraying Gray Silver (RM/PC) 0.0000 (A) HOT STAMPING (RM/PC) 0.0000 SUB-TOTAL COST (RM/PC) 0.0000 OTHERS PACKAGING (RM/PC) 0.0000 (B) DELIVERY to xxxx (RM/PC) 0.0000 SUB-TOTAL COST (RM/PC) 0.0000 TOTAL COST (RM/PC) : 1.1159 Note: The part weight of Front Panel is 50.00 grams calculated from the Inventor data. The number of cavities is 1 The tonnage machine is 150 tonnes with a RM 64.90/hr. rate. The total moulding cost for Front Panel is RM 1.1159 14
Image of page 15
2.4.2 BACK PANEL Table 2: Back Panel moulding cost estimation. DESCRIPTIO N PART NAME BACK PANEL PART NO. 300-0002-00 MATERIAL TYPE ABS MATERIAL COLOUR SMOOTH ASH PRICE/KG (RM) 2.37 RAW NO. OF CAVITY 1 MATERIAL PART WEIGHT (GM) 149.00 RUNNER WEIGHT (GM) 14.90 SHOT WEIGHT (GM) 163.90 MATERIAL YIELD RATE (%) 10.00 MATERIAL WASTAGE (%) 20.00 MATERIAL COST (RM/PC) 0.5050 MACHINE TONNAGE 150 MACHINE RATE (RM/HR) 64.90 MOULDING MACHINE INEFFICIENCY (%) 5.00 CYCLE TIME (SECS) 50.00 PRODUCTION OUTPUT (PCS/HR) 72 MOULDING COST (RM/PC) 0.9465 SUB-TOTAL COST (RM/PC) 1.4514 SECONDARY TAMPO PRINT (RM/PC) 0.0000 PROCESS Spraying Gray Silver (RM/PC) 0.0000 (A) HOT STAMPING (RM/PC) 0.0000 SUB-TOTAL COST (RM/PC) 0.0000 OTHERS PACKAGING (RM/PC) 0.0000 (B) DELIVERY to xxxx (RM/PC) 0.0000 SUB-TOTAL COST (RM/PC) 0.0000 TOTAL COST (RM/PC) : 1.4514 Note: The part weight of Back Panel is 149 grams calculated from the Inventor data.
Image of page 16
Image of page 17

You've reached the end of your free preview.

Want to read all 39 pages?

  • Fall '15
  • Machine Tonnage

What students are saying

  • Left Quote Icon

    As a current student on this bumpy collegiate pathway, I stumbled upon Course Hero, where I can find study resources for nearly all my courses, get online help from tutors 24/7, and even share my old projects, papers, and lecture notes with other students.

    Student Picture

    Kiran Temple University Fox School of Business ‘17, Course Hero Intern

  • Left Quote Icon

    I cannot even describe how much Course Hero helped me this summer. It’s truly become something I can always rely on and help me. In the end, I was not only able to survive summer classes, but I was able to thrive thanks to Course Hero.

    Student Picture

    Dana University of Pennsylvania ‘17, Course Hero Intern

  • Left Quote Icon

    The ability to access any university’s resources through Course Hero proved invaluable in my case. I was behind on Tulane coursework and actually used UCLA’s materials to help me move forward and get everything together on time.

    Student Picture

    Jill Tulane University ‘16, Course Hero Intern

Stuck? We have tutors online 24/7 who can help you get unstuck.
A+ icon
Ask Expert Tutors You can ask You can ask You can ask (will expire )
Answers in as fast as 15 minutes