Course Hero Logo

C the core switches should be replaced with switches

Course Hero uses AI to attempt to automatically extract content from documents to surface to you and others so you can study better, e.g., in search results, to enrich docs, and more. This preview shows page 6 - 9 out of 9 pages.

C. The core switches should be replaced with switches that have larger ARP tables.D. The wired VLANs should be combined into a single VLAN and /16 subnet.Answer:B
Question: 56A customer has an existing Aruba network, which currently supports up to 9,000 wireless client devices. The existing network includes these components:Four 7210 MCsFive 7030 MCs200 AP-303HRs300 AP-345sThe customer wants to convert to an ArubaOS 8.x architecture. The architect plans to deploy a virtual MM.Which exhibit shows the correct BOM for the MM?
C
Question: 57A customer has multiple medium and large branch sites, each of which requires between 8 and 16 APs and supports between 200 and 600 wireless clients. Every branch site has an internetconnection, which it uses to reach the central data center. The customer would prefer the WAN links to be optimized in the solution.Each side handles between 1 and 2 Gbps of traffic, most of which goes to the central data center. The data center has 7210 controllers for terminating the VPN connections. Which branch officesolution best meets the customer needs?B
Question: 58Refer to the exhibits.Exhibit 1. Existing wiring plan:Exhibit 2. Current proposal:A customer has a building that needs a switch upgrade. The customer would like at least 20Gbps for the uplink bandwidth out of each closet. The building writing plan is shown in Exhibit 1. Thecustomer will not consider any cable upgrades at this point. The current proposal is shown in Exhibit 2.Which correction must architect make to the proposal to meet the customer requirements?D
Question: 59What is one customer requirement that can drive the need for a relatively dense AP deployment, in which the coverage areas of at least three AP radios overlap?A. support for beacon managementB. AP operation as hybrid AMs for IDS/WIPSC. the deployment of dual 5GHz radio APsD. location tracking of wireless IoT devices
Answer:D
Question: 60Refer to the exhibit.An architect has planned the wireless and wired access layers for a network upgrade. The entire solution must support 9,000 wireless devices and 2,250 wired endpoints.The campus core must meet these requirements: no more than 4:1 oversubscription on the links to the data center switch-level redundancy near instant failover if one core switch fails link aggregationsbetween access layer and core same switch software used across the entire campus Which exhibit shows a campus core that meets the customer needs?B
For More exams visit https://killexams.com/vendors-exam-listKill your exam at First Attempt....Guaranteed!
End of preview. Want to read all 9 pages?

Upload your study docs or become a

Course Hero member to access this document

Term
Fall
Professor
Mohammad Alizadeh
Tags
Network switch, Wireless network, Optical fiber connector

Newly uploaded documents

Show More

Newly uploaded documents

Show More

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture