Proposal may contain weaknesses which have little

Course Hero uses AI to attempt to automatically extract content from documents to surface to you and others so you can study better, e.g., in search results, to enrich docs, and more. This preview shows page 91 - 95 out of 109 pages.

Proposal may contain weakness(es) which have little potential to cause disruption of schedule, increased cost or degradation of performance. Normal contractor effort and normal Government monitoring will likely be able to overcome any difficulties.ModerateProposal contains a significant weakness or combination of weaknesses which may potentially cause disruption of schedule, increased cost or degradation of performance. Special contractor emphasis and close Government monitoring will likely be able to overcome difficulties.HighProposal contains a significant weakness or combination of weaknesses which is likely to cause significant disruption of schedule, increased cost or degradation of performance. Is unlikely to overcome any difficulties, even with special contractor emphasis and close Government monitoring.UnacceptableProposal contains a material failure or a combination of significant weaknesses that increases the risk of unsuccessful performance to an unacceptable level.
Technical Rating Evaluation (Methodology 2)92Table 3. Combined Technical/Risk Rating MethodColorRatingDescriptionBlueOutstandingProposal indicates an exceptional approach and understanding of the requirements and contains multiple strengths, and risk of unsuccessful performance is low. PurpleGoodProposal indicates a thorough approach and understanding of the requirements and contains at least one strength, and risk of unsuccessful performance is low to moderate. GreenAcceptableProposal meets requirements and indicates an adequate approach and understanding of the requirements, and risk of unsuccessful performance is no worse than moderate.YellowMarginalProposal has not demonstrated an adequate approach and understanding of the requirements, and/or risk of unsuccessful performance is high.RedUnacceptableProposal does not meet requirements of the solicitation, and thus, contains one or more deficiencies, and/or risk of unsuccessful performance unacceptable. Proposal is unawardable.
Agile Contracting…Enabling affordable war-winning capability on timeTechnical Ratings93Table C-1. Technical Acceptable/Unacceptable RatingMethodRatingDescriptionAcceptableProposal meets the requirements of the solicitation.UnacceptableProposal does not meet the requirements of the solicitation.
Agile Contracting…Enabling affordable war-winning capability on timePast Performance Evaluation94Table C-2. Past Performance Acceptable/Unacceptable Rating MethodRatingDescriptionAcceptableBased on the offeror’s performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort, or the offeror’s performance record is unknown. (See note above.)UnacceptableBased on the offeror’s performance record, the Government does not have a reasonable expectation that the offeror will be able to successfully perform the required effort.

Upload your study docs or become a

Course Hero member to access this document

Upload your study docs or become a

Course Hero member to access this document

End of preview. Want to read all 109 pages?

Upload your study docs or become a

Course Hero member to access this document

Term
Spring
Professor
Management Concepts
Tags
Requirements analysis, Request for proposal, Product requirements document

Newly uploaded documents

Show More

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture