3 of 17 1222020 832 pm

This preview shows page 3 - 6 out of 17 pages.

3 of 17 1/22/2020, 8:32 PM
Image of page 3
Question Correct 6 1.00 points out of 1.00 Question 7 Correct 1.00 points out of 1.00 During the create WBS process for the financial reporting improvement process, the teamcould create all the following breakdown structures as planning evolves except? Select one:a. Bill of materialsb. Resource breakdown structurec. Communication breakdown structured. Risk breakdown structureThe communication breakdown structure is a distracter in that it does not exist. The bill ofmaterials lists all the components, assemblies, and sub-assemblies. The risk breakdownstructure decomposes the risks on a project. The resource breakdown structure shows thetype of resources utilized on a project. [Crosswind Manual 5.4.5; PMBOK® Guide 9.1.2.2]The correct answer is: Communication breakdown structure During what processes is work decomposition performed? Scope Practice Exam (30 Questions) 4 of 17 1/22/2020, 8:32 PM
Image of page 4
Question 8 Correct 1.00 points out of 1.00 Question Correct 9 1.00 points out of 1.00 Of the following breakdown structures and descriptions, which is correct?
Image of page 5
Image of page 6

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture