B The device connected to port 7 was replaced C The limit of 64 unique SID

B the device connected to port 7 was replaced c the

This preview shows page 2 - 4 out of 4 pages.

B. The device connected to port 7 was replaced. C. The limit of 64 unique SID entries per quad is exceeded. D. The switch lost the zoning information for port 7. 18
Image of page 2
Answer: C QUESTION: 53 What is recommended when you integrate a Storage Management Appliance (SMA) in a fabric? A. Create a separate zone for the SMA and the servers. B. Create a separate zone for the SMA and the managed storage. C. Disable System Insight Manager in the SAN environment. D. Create a common zone for the SMA, servers, and managed storage. Answer: B QUESTION: 54 Port binding is implemented in a SAN. An HBA failed and is replaced with a new one. What happens? A. The switch requests adapter information and updates its database. B. The new HBA logs in to the switch and starts working. C. The new HBA is blocked and does not operate. D. The switch port remains offline until the switch is restarted. Answer: C QUESTION: 55 What do you use to assign disk space from a storage subsystem to a specific host computer? A. Disk Administrator B. OpenView Storage Node Manager C. Selective Storage Presentation D. OpenView Storage Builder Answer: C 19
Image of page 3
For More exams visit http s ://killexams.com /vendors-exam-list Kill your exam at First Attempt .... Guaranteed!
Image of page 4

You've reached the end of your free preview.

Want to read all 4 pages?

  • Fall '20
  • Network switch, HP OpenView, new HBA logs

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture