a Requirements for the Certified Individual CI The CI shall 1 be an employee of

A requirements for the certified individual ci the ci

This preview shows page 257 - 259 out of 422 pages.

(a) Requirements for the Certified Individual (CI) . The CI shall (1) be an employee of the Manufacturer or Assembler. (2) be qualified and certified by the Manufacturer or Assembler. Qualifications shall include as a minimum (-a) knowledge of the requirements of this Divi- sion for the application of the Certification Mark and ap- propriate Designator (-b) knowledge of the Manufacturer s or Assem- bler s quality program (-c) training commensurate with the scope, com- plexity, or special nature of the activities to which over- sight is to be provided (3) have a record, maintained and certified by the Manufacturer or Assembler, containing objective evi- dence of the qualifications of the CI and the training pro- gram provided (b) Duties of the Certified Individual (CI) . The CI shall (1) verify that each item to which the Certification Mark is applied meets all applicable requirements of this Division and has a current capacity certification for the Certification Mark with appropriate Designator (2) review documentation for each lot of items to be stamped to verify, for the lot, that requirements of this Di- vision have been completed (3) sign the Certificate of Conformance Form K-4 or Form K-5 , as appropriate, prior to release of control of the item (c) Certificate of Conformance Form K-4 or Form K-5 (1) The appropriate Certificate of Conformance shall be filled out by the Manufacturer or Assembler and signed by the CI. Multiple duplicate pressure relief devices may be recorded on a single entry, provided the devices are identical and produced in the same lot. (2) The Manufacturer s or Assembler s written qual- ity control program shall include requirements for com- pletion of Certificates of Conformance forms and retention by the Manufacturer or Assembler for a mini- mum of 6 years. ASME BPVC.VIII.3-2015 210 Copyright ASME International (BPVC) Provided by IHS under license with ASME Licensee=Mattco Manufacturing/5970597001, User=Ahlgren, Jason Not for Resale, 01/29/2016 14:06:41 MST No reproduction or networking permitted without license from IHS --``,,,,,`,,,,``,,```,,``,,``-`-`,,`,,`,`,,`---
Image of page 257
ARTICLE KR-5 CERTIFICATION OF FLOW CAPACITY OF PRESSURE RELIEF VALVES KR-500 FLOW CAPACITY CERTIFICATION TESTS KR-501 FLUID MEDIA Flow capacity certification tests shall be conducted with liquids, or vapors as appropriate. For fluids which are to be handled near their critical point, or in any region where their thermodynamic properties are significantly nonlinear, or where a change of phase may occur in the valve (flashing), the flow capacity shall be determined from the vapor and liquid capacity data using appropriate correlations and procedures. Saturated water service is addressed in KR-532(a) . Alternatively, the flow capacity and design of the overpressure protection system may be specified by the User or his Agent, based on basic data, testing, and demonstration on such actual fluids at ex- pected operating conditions. This information is stated in the User s Design Specification; see KG-311.11 .
Image of page 258
Image of page 259

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture