0 m3 343701000 Rp 4811814 Rp Paku 00120 kg 1948000 Rp 23376 Rp List

0 m3 343701000 rp 4811814 rp paku 00120 kg 1948000 rp

This preview shows page 29 - 33 out of 214 pages.

Kayu 5/7 0.0140 m3 3,437,010.00 Rp. 48,118.14 Rp. Paku 0.0120 kg 19,480.00 Rp. 233.76 Rp. List kayu 2/4 0.0030 m3 6,147,530.00 Rp. 18,442.59 Rp. Jumlah (1). 120,794.49 Rp. 2 Tenaga Pekerja 0.1000 oh 66,000.00 Rp. 6,600.00 Rp. Tukang batu 0.0500 oh 100,000.00 Rp. 5,000.00 Rp. Kepala Tukang 0.0050 oh 120,000.00 Rp. 600.00 Rp. Mandor 0.0020 oh 100,000.00 Rp. 200.00 Rp. Jumlah (2). 12,400.00 Rp. Jumlah (1) + (2) 133,194.49 Rp. Keuntungan 10% 13,319.45 Rp. Jumlah 146,513.94 Rp. Kode D.31. 1 m2 Pasangan dinding anyaman bambu, rangka kayu Dibulatkan 146,500.00 Rp. D.32. 1 m2 Pasangan dinding partisi double gybsum tebal 9 mm 1 Bahan Gybsum 9 mm 0.7700 lbr 21,006.94 Rp. 16,175.35 Rp. Balok Kayu Borneo Super 0.0150 m3 3,437,010.00 Rp. 51,555.15 Rp. Paku kaso 0.0200 kg 18,720.00 Rp. 374.40 Rp. Paku Gypsum 0.2000 kg 21,890.00 Rp. 4,378.00 Rp. Jumlah (1). 72,482.90 Rp.
Image of page 29
HARGA JUMLAH KOEF. SAT. SATUAN HARGA Rp. Rp. KODE URAIAN PEKERJAAN 2 Tenaga Tukang Kayu 0.7000 oh 105,000.00 Rp. 73,500.00 Rp. Kepala Tukang Kayu 0.0700 oh 120,000.00 Rp. 8,400.00 Rp. Pekerja 0.3500 oh 66,000.00 Rp. 23,100.00 Rp. Mandor 0.1260 oh 120,000.00 Rp. 15,120.00 Rp. Jumlah (2). 120,120.00 Rp. Jumlah (1) + (2) 192,602.90 Rp. Keuntungan 10% 19,260.29 Rp. Jumlah 211,863.19 Rp. Kode D.32. 1 m2 Pasangan dinding partisi double gybsum tebal 9 mm Dibulatkan 211,800.00 Rp. D32.a 1 m2 1 Bahan Hollow 40 x 40 mm 5.5000 m' 12,650.00 Rp. 69,575.00 Rp. Paku sekrup 0.2200 kg 13,360.00 Rp. 2,939.20 Rp. GRC Board 2.4 x 1.2 x 0.08 2.0000 m2 24,583.33 Rp. 49,166.67 Rp. coumpond 0.0600 zak 122,960.00 Rp. 7,377.60 Rp. Jumlah (1). 129,058.47 Rp. 2 Tenaga Pekerja 0.5600 oh 66,000.00 Rp. 36,960.00 Rp. Tukang kayu 0.6400 oh 105,000.00 Rp. 67,200.00 Rp. Kepala tukang 0.1600 oh 120,000.00 Rp. 19,200.00 Rp. Mandor 0.0800 oh 100,000.00 Rp. 8,000.00 Rp. Jumlah (2). 131,360.00 Rp. Jumlah (1) + (2) 260,418.47 Rp. Keuntungan 10% 26,041.85 Rp. Jumlah 286,460.31 Rp. Kode D32.a 1 m2 Dibulatkan Rp. 286,400.00 D.33. 1 m2 Pasangan Hebel tb. 10 cm 1 Bahan Hebel tb. 10 cm 11.0000 bh 9,410.00 Rp. 103,510.00 Rp. Mortar MU 380 11.4300 Kg 3,275.00 Rp. 37,433.25 Rp. Jumlah (1). 140,943.25 Rp. 2 Tenaga Pekerja 0.3200 oh 66,000.00 Rp. 21,120.00 Rp. Tukang batu 0.1000 oh 100,000.00 Rp. 10,000.00 Rp. Kepala Tukang 0.0100 oh 120,000.00 Rp. 1,200.00 Rp. Mandor 0.0150 oh 100,000.00 Rp. 1,500.00 Rp. Jumlah (2). 33,820.00 Rp. Jumlah (1) + (2) 174,763.25 Rp. Keuntungan 10% 17,476.33 Rp. Jumlah 192,239.58 Rp. Kode D.33. 1 m2 Pasangan Hebel tb. 10 cm Dibulatkan 192,200.00 Rp. D.34 1 m2 Pasang dinding roster/terawang (20 x 20 x 11) campuran 1 PC :3 Psr 1 Bahan Roster/terawang beton 25.000 bh 15,690.00 392,250.00 Semen Portland 14.000 kg 1,360.00 19,040.00 Pasir pasang 0.032 m3 203,500.00 6,512.00 Jumlah (1). 417,802.00 2 Tenaga Pekerja 0.300 oh 66,000.00 19,800.00 Tukang batu 0.100 oh 100,000.00 10,000.00 Kepala Tukang 0.0100 oh 120,000.00 1,200.00 Mandor 0.0150 oh 100,000.00 1,500.00 Jumlah (2). 32,500.00 Jumlah (1) + (2) 450,302.00 Keuntungan 10% 45,030.20 Jumlah 495,332.20 Kode D.34 1 m2 Pasang dinding roster/terawang (20 x 20 x 11) campuran 1 PC :3 Psr Dibulatkan 495,300.00 DInding GRC dobel, uk. (120 x 240) tebal 8mm + dobel rangka hollow 40 x 40 mm (60 x60) DInding GRC dobel, uk. (120 x 240) tebal 8mm + dobel rangka hollow 40 x 40 mm (60 x60)
Image of page 30
HARGA JUMLAH KOEF. SAT. SATUAN HARGA Rp. Rp. KODE URAIAN PEKERJAAN D.35 1 m2 Ornamen dinding, Paving type Fullpave t. 6 cm (20 x 20) campuran 1 PC :3 Psr 1 Bahan Paving type Fullpave t. 6 cm (20 x 20) 1.050 m2 84,750.00 88,987.50 Semen Portland 14.000 kg 1,360.00 19,040.00 Pasir pasang 0.032 m3 203,500.00 6,512.00 Jumlah (1). 114,539.50 2 Tenaga Pekerja 0.300 oh 66,000.00 19,800.00 Tukang batu 0.100 oh 100,000.00 10,000.00 Kepala Tukang 0.0100 oh 120,000.00 1,200.00 Mandor 0.0150 oh 100,000.00 1,500.00 Jumlah (2). 32,500.00 Jumlah (1) + (2) 147,039.50 Keuntungan 10% 14,703.95 Jumlah 161,743.45 Kode D.35 1 m2 Ornamen dinding, Paving type Fullpave t. 6 cm (20 x 20) campuran 1 PC :3 P Dibulatkan 161,700.00
Image of page 31
HARGA JUMLAH KOEF. SAT. SATUAN HARGA Rp. Rp. PEKERJAAN PLESTERAN Ruang Lingkup Jenis pekerjaan yang dicakup meliputi : 1. Pembuatan plesteran dalam berbagai ketebalandan campuran 2. Pekerjaan berapen pondasi dan plesteran kedap air dengan menggunakan tambahan bahan kimia E.1. 1 m2 Plesteran 1 pc : 1 ps, tebal 15 mm 1 Bahan Semen Portland 15.5040 kg 1,360.00 Rp. 21,085.44 Rp.
Image of page 32
Image of page 33

You've reached the end of your free preview.

Want to read all 214 pages?

  • Fall '18
  • Na

What students are saying

  • Left Quote Icon

    As a current student on this bumpy collegiate pathway, I stumbled upon Course Hero, where I can find study resources for nearly all my courses, get online help from tutors 24/7, and even share my old projects, papers, and lecture notes with other students.

    Student Picture

    Kiran Temple University Fox School of Business ‘17, Course Hero Intern

  • Left Quote Icon

    I cannot even describe how much Course Hero helped me this summer. It’s truly become something I can always rely on and help me. In the end, I was not only able to survive summer classes, but I was able to thrive thanks to Course Hero.

    Student Picture

    Dana University of Pennsylvania ‘17, Course Hero Intern

  • Left Quote Icon

    The ability to access any university’s resources through Course Hero proved invaluable in my case. I was behind on Tulane coursework and actually used UCLA’s materials to help me move forward and get everything together on time.

    Student Picture

    Jill Tulane University ‘16, Course Hero Intern

Stuck? We have tutors online 24/7 who can help you get unstuck.
A+ icon
Ask Expert Tutors You can ask You can ask You can ask (will expire )
Answers in as fast as 15 minutes