Studying jk banks existing network server and

This preview shows page 31 - 33 out of 38 pages.

Studying J&K Bank’s existing Network, Server and Security appliances, LAN,WAN & Internet Links and segments etc. and suggesting suitable changes for deployment of proposed solution.Yes 2Study of J&K Bank’s Data Centre architecture.Yes 3Study of J&K Bank’s existing security environment & policies and recommending best practices in Accordance with these policiesYes 4Providing an escalation matrix within 4 weeks of the issue of Purchase Order for different levels of support callsYes 5Preparation of the solution design in line with ISO27001:2013 standards as modified from time to timeYes 6Preparation of a detailed execution plan along with milestones. HLD and LLD should be prepared in consultation with OEM and J&K Bank for rollout.The design should be OEM certified.Yes 7The plan document must be submitted to J&K Bank with supporting designs and drawings within 3 weeks of placing the order. The actual execution will start only after approval of plan by J&K Bank officials.Yes 8The plan shall include information related to required downtime, changes to existing architecture,deployment schedule, fallback strategy, crisis management, emergency response procedures, Standard Operating Procedure, etc. The installation of the equipment shall be done as a planned activity on the date & time as per the approved deployment schedule.Yes 9The installation will include proper mounting, labeling, tagging of all the equipment and provision of network and power connections Mounting physical devices onto racks as requiredYes 10Powering on the physical devices& running Hardware DiagnosticsYes 11Installing the required OS and Applications on Physical HardwareYes 12Configuring IP address and default gateway etc. on all devicesYes 13Check L2 & L3 connectivity on networkYes 14Installing License on respective appliancesYes 15Configuring Appliances in HA mode (either in Active-Active or Active-Standby as specified by J&K Bank)Yes 16Checking for Failover between appliancesYes 17Configuration and enablement of the licensed features on the applianceYes 30All Rights ReservedCONFIDENTIAL
Solution Approach document for J& K Bank RFP Ref No.” JKB/ITP/F815-II/2019-01218Configuration of the Application Firewall for the OWASP Vulnerability and Cyber Security threatsYes 19Deployment of the existing configuration and capabilities on the Proposed AppliancesYes 20Deployment and Configuration of Centralized Management ServersYes 21Application Performance Analytics and Dashboard.Yes sr. no.Implementation & MigrationConfirmation_ISL1Integration of the solution with J&K Bank’s existing Local Area Network, Wide Area Network, Server and Security infrastructure, etc. The selected bidder needs to work closely with J&K Bank for preparation, configuration and migration of all existing ADC policies.Yes 2Design of Application Security Architecture.Yes 3Implementation of the IP addressing Schema (IPv4 as well as IPv6) in accordance with requirement of J&K Bank and the guidelines prescribed by government agencies/regulatorsYes 4

Upload your study docs or become a

Course Hero member to access this document

Upload your study docs or become a

Course Hero member to access this document

End of preview. Want to read all 38 pages?

Upload your study docs or become a

Course Hero member to access this document

Term
Fall
Professor
NoProfessor
Tags
Web server, load balancing, K Bank

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture