Classification of enterprises high probability medium

  • No School
  • AA 1
  • 75

This preview shows page 8 - 14 out of 75 pages.

Classification of Enterprises High Probability Medium Probability Investor-backed Contract with Suppliers (not necessarily) Low Probability Nothing set Investor-backed EPC contracted Equipment Suppliers Contracted 880 868,8 424,3 120 5 105 2017 2018 2019 2020 2021 MWAC High Probability Medium Probability2 Low Probability3 New Auctions are key to keep the pipeline of future projects! ? ? ? Regarding PV Projects contracted in 2014 and 2015.
Image of page 8
Projects in Operation,Test or Construction Completion Expected for 2018 Projects under Construction 30 MW 270 MW 430 MW 150 MW 80 MW 90 MW 89.7 MW 300 MW 150 MW Completion Expected in 2017 Projects in Operation, under test or Construction *data brought up to date in November, 2017. Regarding PV Projects contracted in 2014 and 2015.
Image of page 9
Project Overload % Enterprises Overload (%) [MWp/MWac] Overload Relation between DC power and AC power of the Power Plant. Usage Increase the power generation with low CAPEX raise. Ideal Overload There is no ideal Overload. Each project must seek the best balance between DC and AC power according to its IRR. It is observed that a significant portion of the contracted projects obtained an Overload between 20% and 25%. Overload Histogram of the Contracted Projects
Image of page 10
Capacity Factor % Projects CF (%) Capacity Factor (%) Relationship between the amount of power generated by the power plant according to its potential of generation (if the power plant operates 100% of the time under maximum capacity). Usage Comparison between power plants in different locations and/or with different technologies. Ideal CF There is no ideal CF, but the higher CF, the greater is the power generated (often without a high increase in CAPEX). Evaluate sites of greater productivity and use technologies that increase the generation and/or reduce losses in the power plant. Those measures are key to achieve more profitable projects. CF (Capacity Factor) Histogram of the Contracted Projects
Image of page 11
BUSINESS Opportunities in the Brazilian Utility Scale PV Market
Image of page 12
Introduction High Probability The first solar power plants in Brazil are being constructed, creating many opportunities for various sectors of the PV chain. This report points out business opportunities for projects contracted in the 3 auctions in 2014 and 2015 considering its development stages. PV Plants in Operation PV Plants under Test PV Plants under Construction PV Plants which has Not Started Construction Opportunities to buy assets. Opportunities for Operation & Maintenance services. Opportunities for Owner's Engineering and Certification services. Opportunities for secondary suppliers and outsourced services. PV Projects without EPC contract and Suppliers* PV Projects with medium probability have not contracted the EPC and there may be opportunities for various services and equipment suppliers. PV Projects with no Investors, EPC or Suppliers Low probability PV Projects have not defined their suppliers, not contracted EPC and, in particular, have not yet signed an investment agreement/contract for the plant construction.
Image of page 13
Image of page 14

You've reached the end of your free preview.

Want to read all 75 pages?

  • Fall '19
  • Photovoltaics, Weighted average cost of capital

What students are saying

  • Left Quote Icon

    As a current student on this bumpy collegiate pathway, I stumbled upon Course Hero, where I can find study resources for nearly all my courses, get online help from tutors 24/7, and even share my old projects, papers, and lecture notes with other students.

    Student Picture

    Kiran Temple University Fox School of Business ‘17, Course Hero Intern

  • Left Quote Icon

    I cannot even describe how much Course Hero helped me this summer. It’s truly become something I can always rely on and help me. In the end, I was not only able to survive summer classes, but I was able to thrive thanks to Course Hero.

    Student Picture

    Dana University of Pennsylvania ‘17, Course Hero Intern

  • Left Quote Icon

    The ability to access any university’s resources through Course Hero proved invaluable in my case. I was behind on Tulane coursework and actually used UCLA’s materials to help me move forward and get everything together on time.

    Student Picture

    Jill Tulane University ‘16, Course Hero Intern

Stuck? We have tutors online 24/7 who can help you get unstuck.
A+ icon
Ask Expert Tutors You can ask You can ask You can ask (will expire )
Answers in as fast as 15 minutes
A+ icon
Ask Expert Tutors