Remediation Accessed shows whether you accessed those linksN represents links

Remediation accessed shows whether you accessed those

This preview shows page 8 - 11 out of 20 pages.

Remediation Accessed shows whether you accessed those links.'N' represents links not visited and 'Y' represents visited links. Back to Status pagecontains 18 Questions1) The Test and Evaluation Master Plan (TEMP) is mandated by DoD policy and must be updated periodically to ensure that it stays current as the program evolves through the life cycle.[21a. Recognize how the Test and Evaluation Master Plan (TEMP) generation, staffing and approval process integrates all functional disciplines throughout the acquisition life cycle.]TrueFalse2) Which one of the following organizations would evaluate measures of effectiveness (MOEs) to determine how well a munitions system can perform its mission? [29b. Identify the key T&E support organizations within DoD.]Marine Corps Operational Test and Evaluation Activity (MCOTEA)
Background image
Marine Corps Systems Command (MARCORSYSCOM)Defense Contract Management Agency (DCMA)Joint Interoperability Test Command (JITC)3) If the program is on the DOT&E Oversight List, which one of the following test and evaluation (T&E) products is required before the Full Rate Production Decision Review? [29c (2). Identify the primary Test and Evaluation (T&E) products required at each acquisition milestone.][Remediation Accessed :N] 4) The operational effectiveness and operational suitability questions that must be addressed during Operational Test and Evaluation (OT&E) to assess the system's capability to perform its mission are called ___________. [29c. Identify the primary Test and Evaluation (T&E) products required at each acquisition milestone.]5) Threshold values, establishing (minimum) parameters for a system, and objective values, establishing desired parameters for a system, can be found in the: [3a(3). Identify the information required for a decision review and recognize the significance of the Acquisition Program Baseline (APB), Key Performance Parameters (KPPs), and Acquisition Strategy.]
Background image
6) Executive Orders 13423 & 13514, sometimes referred to as “Greening the Government": [3b. Identify key federal and DoD policies governing environmental, safety, and health issues associated with defense systems acquisition.]Directs all Federal Agencies to establish plans to improve energy efficiency, reduce greenhouse States that Major Program Managers must take and pass formal training in environmental gas emissions, conserve and protect water resources and reduce or eliminate toxic or hazardous materials.protection.
Background image
Image of page 11

You've reached the end of your free preview.

Want to read all 20 pages?

  • Fall '16
  • Integrated Product, Acquisition Program Baseline, operational test, process development

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture