Schedule the job to run every day after the archive process completes D Create

Schedule the job to run every day after the archive

This preview shows page 11 - 19 out of 21 pages.

Reporting Services service. Schedule the job to run every day after thearchive process completes.D. Create a shared schedule. Configure the datasets to expire on theshared schedule.Answer: A14.DRAG DROPYou are creating the Australian states query. page 11 / 21
Image of page 11
Which Multidimensional Expressions (MDX) calculation should you use to complete the query? To answer, drag the appropriate calculation to the answer area. page 12 / 21
Image of page 12
page 13 / 21
Image of page 13
Answer: page 14 / 21
Image of page 14
page 15 / 21
Image of page 15
15.DRAG DROP You are designing a SQL Server Reporting Services (SSRS) solution. A report project must access multiple SQL Server databases. Each database is on a different instance. The databases have identical schema and security configurations. You have the following requirements: - The report must support subscriptions. - Users must be able to select the host when running the report. What should you do? To answer, drag the appropriate phrase or phrases from the list to the correct location or locations in the answer area. (Answer choices may be used once, more than once, or not all.) Answer: page 16 / 21
Image of page 16
16.You administer a SQL Server Reporting Services (SSRS) instancein native mode.You need to assign a predefined role that meets the followingrequirements:- Members of the role must be able to update shared data sources.- Members of the role must not be able to consume reports or managesubscriptions.- The role must provide only the minimum permissions required.Which role should you assign? (More than one answer choice mayachieve the goal. Select the BEST answer.) 17.You have a SQL Server Reporting Services (SSRS) 2008 instanceintegrated with an Internet-facing Microsoft SharePoint 2010 farm.PerformancePoint Services and Excel Services are installed andconfigured. You need to upgrade to SSRS 2012 with the minimumdowntime and hardware requirements.What should you do? (More than one answer choice may achieve thegoal. Select the BEST answer.) page 17 / 21
Image of page 17
18.DRAG DROP
Image of page 18
Image of page 19

You've reached the end of your free preview.

Want to read all 21 pages?

  • Winter '20
  • Microsoft SQL Server, best answer, SQL Server Reporting, answer area, Server Reporting Services

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture

  • Left Quote Icon

    Student Picture