Frame rate is acceptable as latency is heaps lower

Info icon This preview shows pages 39–41. Sign up to view the full content.

View Full Document Right Arrow Icon
Frame rate is acceptable as latency is heaps lower. Latency drops to under 84 milliseconds Audio is excellent Easy to run a meeting at this bit rate Server is happy at 60% Recommendation Planning and calculating you initial expected use and working out the maximum users that your network is capable of is imperative to planning you real time communication services. You will find that there are many server options to limit bandwidth per user, per room, number of cameras and many more server side settings to manage your real time communication server. Make sure if you are running your own server you have someone on staff that has experience and understands the system, requirements and administration to keep control and troubleshoot your real time servers. 5.3 Applications Projects Applications Projects showed that there were many points of possible failure in delivering end-to-end high capacity connectivity – often based around the current setting of throttling traffic at an institutional or state network level, in addition to firewalls and on-campus infrastructure. Recommendation To run projects that require high capacity connectivity, usually using some type of real time communication, to test the network capacity and reveal possible inhibitors to connectivity. Learning – incorporating high capacity connectivity into VET practice Enabling practitioners to effectively and comfortably use technology for training, particularly real-time online activities requires significant work, energy and commitment. Relying on the goodwill and enthusiasm of Proof of Concept Network Project Final ReportJanuary 2010 Page 39 of 55
Image of page 39

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
practitioners, administrators and network manager, as was the case to a large degree in the POCN Project, is not feasible. These activities need to be integrated across an organisation’s business planning, have the support of the executive, and receive adequate funding to allow teachers the opportunity to go offline for planning, training and trialling purposes. Recommendation Allow time to trial technologies well in advance so that it can be included in the teaching plan for the following semester/year. Incorporating new technology into an existing teaching plan will only be limited in scope until that technology is proven to be reliable and effective in enhancing the material. 5.4 Governance and Project Management Recommendation The Project demonstrated the complex nature of this type of undertaking, highlighting many of the barriers such as the various approaches to security and network design across jurisdictions, incompatibilities between large and smaller networks, the lack of confidence existing between jurisdictional technical teams and differing state/territory governance arrangements that in all likelihood will still exist when the VEN is implemented. It is recommended that future applications projects consider appointing state-based ICT committees with membership comprising at a minimum: an ICT Manager senior business manager, and a practitioner.
Image of page 40
Image of page 41
This is the end of the preview. Sign up to access the rest of the document.

{[ snackBarMessage ]}

What students are saying

  • Left Quote Icon

    As a current student on this bumpy collegiate pathway, I stumbled upon Course Hero, where I can find study resources for nearly all my courses, get online help from tutors 24/7, and even share my old projects, papers, and lecture notes with other students.

    Student Picture

    Kiran Temple University Fox School of Business ‘17, Course Hero Intern

  • Left Quote Icon

    I cannot even describe how much Course Hero helped me this summer. It’s truly become something I can always rely on and help me. In the end, I was not only able to survive summer classes, but I was able to thrive thanks to Course Hero.

    Student Picture

    Dana University of Pennsylvania ‘17, Course Hero Intern

  • Left Quote Icon

    The ability to access any university’s resources through Course Hero proved invaluable in my case. I was behind on Tulane coursework and actually used UCLA’s materials to help me move forward and get everything together on time.

    Student Picture

    Jill Tulane University ‘16, Course Hero Intern